Obsidian/Personal/Homework Assignment 1.md

10 lines
304 B
Markdown

Dane Sabo
NUCE 2122 - Summer 2025
*Instructions:
Pick a metropolitan area in the US and identify the responsible electric utility.
For that utility, summarize the following based on internet information:
1. Number, type, MWE rating and age of power plants producing electricity for
that utility
2. *