10 lines
304 B
Markdown
10 lines
304 B
Markdown
Dane Sabo
|
|
NUCE 2122 - Summer 2025
|
|
|
|
*Instructions:
|
|
Pick a metropolitan area in the US and identify the responsible electric utility.
|
|
For that utility, summarize the following based on internet information:
|
|
|
|
1. Number, type, MWE rating and age of power plants producing electricity for
|
|
that utility
|
|
2. * |