vault backup: 2025-05-29 14:07:26

This commit is contained in:
Dane Sabo 2025-05-29 14:07:26 -04:00
parent 5013a268b1
commit 3ed979b609

View File

@ -1,3 +1,10 @@
Dane Sabo
NUCE 2122 - Summer 2025
*Instructions:
Pick a metropolitan area in the US and identify the responsible electric utility.
For that utility, summarize the following based on internet information:
1. Number, type, MWE rating and age of power plants producing electricity for
that utility
2. *