NUCE 2122 - Summer 2025
# Instructions
Submit a 500 work analysis predicting two major events and specific locations
that in your estimation have a high probability to occur in the next five years
regarding nuclear operating and construction plants
In support of this, review the list of prematurely shutdown nuclear plants,
review the new plant licensing status as it exists in several states, review the
projected load growth data for the key states we discussed and predict
locations where two events associated with additional nuclear plants will
occur.
Events to be evaluated:
1. A shutdown plant will be restarted (Do not count Palisades or TMI)
2. A partially completed nuclear plant construction restarted
3. A new contract for a new nuclear plant signed and construction begun.
Evaluate your target locations by:
- their predicted electricity consumption growth;
- the availability of purchased power from a neighboring state;
- the current fuel balance issues faced in that location;
- and any reduction in the number of resource energy plants that were
originally scheduled to be constructed per the utilitys strategic plans
# Submission
## Vermont Yankee Restarting
- Vermont Yankee is one of the most recent nuclear reactors to be
decomissioned, and notably, was because of economic factors.
This makes Vermont Yankee an ideal candidate to restart.
- NIMBYs in the area HATE Vermont Yankee. The state senate tried
to block its license extension, but the NRC approved it anyway. The
utility sued the state to stay open and won.
- New England is expecting a 10% power demand increase https://commonwealthbeacon.org/energy/grid-operator-forecasting-11-increase-in-electricity-consumption-by-2034/
- They're counting on two wind farms being built to fill this demand.
- These wind farms might get killed by new admin.
- There is also a massive resevoir and hydrolectric system that was built to
balance load from specifically this reactor. Right now it's being used with
fossil fuel plants, but is a massive piece of infrastructure that will be less
efficient without the NPP