vault backup: 2025-07-14 11:33:45
This commit is contained in:
parent
90d8a239bd
commit
2601db420f
@ -34,5 +34,13 @@ Evaluate your target locations by:
|
||||
- NIMBYs in the area HATE Vermont Yankee. The state senate tried
|
||||
to block its license extension, but the NRC approved it anyway. The
|
||||
utility sued the state to stay open and won.
|
||||
-
|
||||
- New England is expecting a 10% power demand increase https://commonwealthbeacon.org/energy/grid-operator-forecasting-11-increase-in-electricity-consumption-by-2034/
|
||||
- They're counting on two wind farms being built to fill this demand.
|
||||
- These wind farms might get killed by new admin.
|
||||
- There is also a massive resevoir and hydrolectric system that was built to
|
||||
balance load from specifically this reactor. Right now it's being used with
|
||||
fossil fuel plants, but is a massive piece of infrastructure that will be less
|
||||
efficient without the NPP
|
||||
|
||||
|
||||
|
||||
Loading…
x
Reference in New Issue
Block a user