5.9 KiB
5.9 KiB
| id | title | type | created | modified | tags | |
|---|---|---|---|---|---|---|
| 2026-15 | Weekly — 2026-04-08 | Weekly | 2026-04-08T11:00:00Z | 2026-04-08T11:00:00Z |
|
Weekly - 2026 CW 15 (Wed 2026-04-08)
Accomplishments
🎯 MAJOR: FRET Specifications & Reactive Synthesis Progress (April 3)
Significant formal verification work — specifications written, realizability conflicts identified and resolved, test traces analyzed.
- Wrote FRET specifications for the reactor automaton
- Worked through heatup mode requirements: bounded temperature rate (dT_dt constraints), maximum heatup duration before SCRAM
- Developed watchdog pattern for bounded time constraints — key insight: "within T seconds satisfy SCRAM" would force SCRAM always (no happy path to load following); watchdog only fires if STILL in heatup when timer expires
- Typed input/output variables: Inputs (STARTUP, t_dot_exceeded, t_max_exceeded, t_power_min), Outputs (SCRAM, OP_MODE, Cold_Shutdown, Heatup, Load_Follow)
- Hit and resolved realizability conflict (PWR-0000 vs PWR-2001 vs PWR-3002) — added "While !SCRAM" scope to PWR-2001 so startup only happens outside SCRAM
- Analyzed 67 test traces against 8 requirements:
- Only 4/67 pass all requirements
- PWR-2001 fails in 49 traces (adversarial: STARTUP + t_max_exceeded simultaneously)
- 75 physical consistency warnings (Heatup=1 with OP_MODE=0)
- Traces appear to be counterexamples, not valid behaviors
- Identified need for explicit both-sides specification of inequalities/implications — potential FRETless design improvement (implicit iff support)
Status: DR-72 (FRET specs) marked Done. Understanding of FRET's limitations deepening — feeding into FRETless design ideas.
DICE 2026 Travel Booked (April 4)
- Expedia booking: $999.77 (hotel + car for SLC)
- DR-78 marked Done
- Conference: May 12-13, Salt Lake City
Firefly III — March 2026 Fully Reconciled (April 3)
- Imported 18 Apple Card transactions (March 28 - April 2)
- Cross-referenced 136 statement transactions against 148 in Firefly
- Cleaned up migration garbage: phantom $5,755.53 payment, duplicate entries, wrong-sign Daily Cash adjustments
- Added 3 missing Daily Cash Adjustment clawbacks
- March Apple Card statement now reconciled clean ($2,898.11 → $9,976.38 payment → $8,728.99 charges → $1,650.72 ending)
🔧 Anthropic Billing Change — Infrastructure Pivot (April 4)
Major cost optimization after Anthropic announced third-party tool billing changes.
- Anthropic subscriptions no longer cover OpenClaw usage (every token billed separately)
- Old config exposure: estimated $600-900/month at Opus 4.6 default
- Reconfigured same day:
- Default model: Sonnet 4.5 (was Opus 4.6) — ~5-10x cheaper
- Heartbeats: Haiku 4.5, 60-minute intervals (was 30min on Opus)
- Prompt caching enabled: "long" retention (90% savings on repeated context)
- Opus available on demand via override
- Target: ~$100/month total
- Created PER project in Plane for personal tasks (non-thesis/car/website)
iMessage Echo Loop Bug — Diagnosed & Fixed (April 6)
- Outbound iMessage replies were echoing back as inbound messages, creating infinite loops
- Root cause: DM chat classified as "self-chat" + binary corruption in
imsg watchtext causing echo cache misses - Applied surgical patch to OpenClaw monitor — forced drop of all
is_from_memessages in self-chat context - ⚠️ Patch gets overwritten on OpenClaw updates — needs re-application
Thesis Draft
- Preliminary Results section skeleton complete with equations (from late March)
- PKE, thermal-hydraulic, and reactivity feedback equations in place with LaTeX labels
- Awaiting Dan's V1 feedback to unlock next steps
Pushed or Rescheduled
Dan Cole V1 Feedback:
- Proposal draft sent March 17 — now Day 22+ with no response
- Expected — Dan busy with Luis finishing up
- All downstream formal verification work blocked on his review
FRET Discussion:
- Punted from Easter Sunday (April 6) to this week
- Topic: extracting actual automaton/AIGER circuit from FRET reactive synthesis output
- Dane wants visualization of the automaton itself for easier trace analysis
Email Infrastructure:
- himalaya still broken on all accounts (since March 24)
- Only default (zoho) accessible
To Do
This Week (CW15):
- Discuss FRET automaton extraction with Dan at group meeting
- Present FRETless as publication roadmap (FRET gaps → enum/FSM extensions → continuous dynamics → nuclear case study)
- Continue barrier certificate work (DR-74, DR-75 — load following + cold shutdown)
- Continue reachability analysis (DR-73, DR-76 — heatup + SCRAM modes)
- DICE presentation prep (May 12-13 approaching — ~5 weeks out)
- Martha's Run 5K — April 11 (Friday)
Personal:
- PER-3: Find +1 for May 9 wedding (deadline passed ~April 6 — status?)
- PER-1: Evaluate OpenAI Codex Plus as potential cost optimization
- PER-4/5: Cancel YouTube TV / Subscribe Pittsburgh Sportsnet
Upcoming:
- May 9: Wedding (guest, not in party)
- May 10: DICE departure to SLC
- May 12-13: DICE 2026 conference
Context
Weather:
- April 1: 58-63°F, rainy morning
- April 3: 85°F high, rain chance midday
- April 4: 87°F high, sunny
- April 6: Heavy rain, 54°F
Fitness Battery (April 6):
- Broad jump: 65 inches
- Dead hang: 32 seconds
- Bench press: 135 × 5
- Lat pulldown est. 1RM: 172
- Leg extension est. 1RM: 187
- Dane felt good about it — saw Jackie and Andreas at gym
Notes:
- FRET specification work is building real expertise — realizability conflicts, trace analysis, variable typing are all thesis-level skills
- The watchdog pattern insight is worth writing up — common control pattern that FRET handles awkwardly
- FRETless iff-style specification is a concrete design improvement to pitch
- Cost optimization was handled well — same-day response, minimal disruption
- CW14 cycle was productive: 9 items created, most FRET/analysis work progressed significantly