vault backup: 2025-05-29 14:13:35
This commit is contained in:
parent
3ed979b609
commit
909678a5b1
@ -1,10 +1,17 @@
|
|||||||
Dane Sabo
|
Dane Sabo
|
||||||
NUCE 2122 - Summer 2025
|
NUCE 2122 - Summer 2025
|
||||||
|
|
||||||
*Instructions:
|
# *Instructions:*
|
||||||
Pick a metropolitan area in the US and identify the responsible electric utility.
|
Pick a metropolitan area in the US and identify the responsible electric utility.
|
||||||
For that utility, summarize the following based on internet information:
|
For that utility, summarize the following based on internet information:
|
||||||
|
|
||||||
1. Number, type, MWE rating and age of power plants producing electricity for
|
1. Number, type, MWE rating and age of power plants producing electricity for
|
||||||
that utility
|
that utility
|
||||||
2. *
|
2. Published strategy for new power plants to be added and plans for specific
|
||||||
|
plants to be shutdown
|
||||||
|
3. % of gas fired plants compared to coal, nuclear, and resource energy*
|
||||||
|
|
||||||
|
*Send the completed summary to `chris67ta@gmail.com`*
|
||||||
|
|
||||||
|
# *Submission*
|
||||||
|
For my selection of a metropolitan area, I chose the Portland Oregon MSA.
|
||||||
|
|||||||
Loading…
x
Reference in New Issue
Block a user