vault backup: 2025-05-29 14:13:35

This commit is contained in:
Dane Sabo 2025-05-29 14:13:35 -04:00
parent 3ed979b609
commit 909678a5b1

View File

@ -1,10 +1,17 @@
Dane Sabo
NUCE 2122 - Summer 2025
*Instructions:
# *Instructions:*
Pick a metropolitan area in the US and identify the responsible electric utility.
For that utility, summarize the following based on internet information:
1. Number, type, MWE rating and age of power plants producing electricity for
that utility
2. *
2. Published strategy for new power plants to be added and plans for specific
plants to be shutdown
3. % of gas fired plants compared to coal, nuclear, and resource energy*
*Send the completed summary to `chris67ta@gmail.com`*
# *Submission*
For my selection of a metropolitan area, I chose the Portland Oregon MSA.