--- id: 2026-15 title: Weekly — 2026-04-08 type: Weekly created: 2026-04-08T11:00:00Z modified: 2026-04-08T11:00:00Z tags: [weekly] --- # Weekly - 2026 CW 15 (Wed 2026-04-08) ## Accomplishments ### 🎯 MAJOR: FRET Specifications & Reactive Synthesis Progress (April 3) **Significant formal verification work — specifications written, realizability conflicts identified and resolved, test traces analyzed.** - Wrote FRET specifications for the reactor automaton - Worked through heatup mode requirements: bounded temperature rate (dT_dt constraints), maximum heatup duration before SCRAM - Developed watchdog pattern for bounded time constraints — key insight: "within T seconds satisfy SCRAM" would force SCRAM always (no happy path to load following); watchdog only fires if STILL in heatup when timer expires - Typed input/output variables: Inputs (STARTUP, t_dot_exceeded, t_max_exceeded, t_power_min), Outputs (SCRAM, OP_MODE, Cold_Shutdown, Heatup, Load_Follow) - Hit and resolved realizability conflict (PWR-0000 vs PWR-2001 vs PWR-3002) — added "While !SCRAM" scope to PWR-2001 so startup only happens outside SCRAM - Analyzed 67 test traces against 8 requirements: - Only 4/67 pass all requirements - PWR-2001 fails in 49 traces (adversarial: STARTUP + t_max_exceeded simultaneously) - 75 physical consistency warnings (Heatup=1 with OP_MODE=0) - Traces appear to be counterexamples, not valid behaviors - Identified need for explicit both-sides specification of inequalities/implications — potential FRETless design improvement (implicit iff support) **Status:** DR-72 (FRET specs) marked Done. Understanding of FRET's limitations deepening — feeding into FRETless design ideas. ### DICE 2026 Travel Booked (April 4) - Expedia booking: $999.77 (hotel + car for SLC) - DR-78 marked Done - Conference: May 12-13, Salt Lake City ### Firefly III — March 2026 Fully Reconciled (April 3) - Imported 18 Apple Card transactions (March 28 - April 2) - Cross-referenced 136 statement transactions against 148 in Firefly - Cleaned up migration garbage: phantom $5,755.53 payment, duplicate entries, wrong-sign Daily Cash adjustments - Added 3 missing Daily Cash Adjustment clawbacks - **March Apple Card statement now reconciled clean** ($2,898.11 → $9,976.38 payment → $8,728.99 charges → $1,650.72 ending) ### 🔧 Anthropic Billing Change — Infrastructure Pivot (April 4) **Major cost optimization after Anthropic announced third-party tool billing changes.** - Anthropic subscriptions no longer cover OpenClaw usage (every token billed separately) - Old config exposure: estimated $600-900/month at Opus 4.6 default - Reconfigured same day: - Default model: Sonnet 4.5 (was Opus 4.6) — ~5-10x cheaper - Heartbeats: Haiku 4.5, 60-minute intervals (was 30min on Opus) - Prompt caching enabled: "long" retention (90% savings on repeated context) - Opus available on demand via override - Target: ~$100/month total - Created PER project in Plane for personal tasks (non-thesis/car/website) ### iMessage Echo Loop Bug — Diagnosed & Fixed (April 6) - Outbound iMessage replies were echoing back as inbound messages, creating infinite loops - Root cause: DM chat classified as "self-chat" + binary corruption in `imsg watch` text causing echo cache misses - Applied surgical patch to OpenClaw monitor — forced drop of all `is_from_me` messages in self-chat context - ⚠️ Patch gets overwritten on OpenClaw updates — needs re-application ### Thesis Draft - Preliminary Results section skeleton complete with equations (from late March) - PKE, thermal-hydraulic, and reactivity feedback equations in place with LaTeX labels - Awaiting Dan's V1 feedback to unlock next steps ## Pushed or Rescheduled **Dan Cole V1 Feedback:** - Proposal draft sent March 17 — now Day 22+ with no response - Expected — Dan busy with Luis finishing up - All downstream formal verification work blocked on his review **FRET Discussion:** - Punted from Easter Sunday (April 6) to this week - Topic: extracting actual automaton/AIGER circuit from FRET reactive synthesis output - Dane wants visualization of the automaton itself for easier trace analysis **Email Infrastructure:** - himalaya still broken on all accounts (since March 24) - Only default (zoho) accessible ## To Do **This Week (CW15):** - Discuss FRET automaton extraction with Dan at group meeting - Present FRETless as publication roadmap (FRET gaps → enum/FSM extensions → continuous dynamics → nuclear case study) - Continue barrier certificate work (DR-74, DR-75 — load following + cold shutdown) - Continue reachability analysis (DR-73, DR-76 — heatup + SCRAM modes) - DICE presentation prep (May 12-13 approaching — ~5 weeks out) - Martha's Run 5K — April 11 (Friday) **Personal:** - PER-3: Find +1 for May 9 wedding (deadline passed ~April 6 — status?) - PER-1: Evaluate OpenAI Codex Plus as potential cost optimization - PER-4/5: Cancel YouTube TV / Subscribe Pittsburgh Sportsnet **Upcoming:** - May 9: Wedding (guest, not in party) - May 10: DICE departure to SLC - May 12-13: DICE 2026 conference ## Context **Weather:** - April 1: 58-63°F, rainy morning - April 3: 85°F high, rain chance midday - April 4: 87°F high, sunny - April 6: Heavy rain, 54°F **Fitness Battery (April 6):** - Broad jump: 65 inches - Dead hang: 32 seconds - Bench press: 135 × 5 - Lat pulldown est. 1RM: 172 - Leg extension est. 1RM: 187 - Dane felt good about it — saw Jackie and Andreas at gym **Notes:** - FRET specification work is building real expertise — realizability conflicts, trace analysis, variable typing are all thesis-level skills - The watchdog pattern insight is worth writing up — common control pattern that FRET handles awkwardly - FRETless iff-style specification is a concrete design improvement to pitch - Cost optimization was handled well — same-day response, minimal disruption - CW14 cycle was productive: 9 items created, most FRET/analysis work progressed significantly