Dane Sabo 1f3afde500 Auto sync: 2025-12-13 22:34:13 (108 files changed)
A  .DS_Store

A  Presentations/.DS_Store

A  Presentations/20251215-Emerson-Pres/.DS_Store

A  Presentations/20251215-Emerson-Pres/ERLM_SABO_DRAFT_PRES.pdf

A  Presentations/20251215-Emerson-Pres/ERLM_SABO_FINAL_PRES.pdf

A  Presentations/20251215-Emerson-Pres/actual-presentation-outline.md

A  Presentations/20251215-Emerson-Pres/bouncing_ball_hybrid.py

A  Presentations/20251215-Emerson-Pres/images/.DS_Store
2025-12-13 22:34:13 -05:00

111 lines
3.1 KiB
TeX
Raw Blame History

\begin{frame}{Staffing these new reactors will be an incredible challenge}
\centering
\underline{How many reactor operators are required to staff this new fleet?}
\vspace{0.3cm}
\begin{columns}[c]
\begin{column}{0.3\textwidth}
\begin{figure}
\includegraphics[width=0.3\textwidth]{images/2_state_of_the_art/nuclear-plant.png}
\caption*{For one Small Modular Reactor (SMR)...}
\end{figure}
\end{column}
\begin{column}{0.7\textwidth}
\centering
% Onslide 1: One shift (2 SROs, 2 ROs)
\only<2>{
\textbf{One shift requires:}
\vspace{0.3cm}
\begin{tikzpicture}
% Adjustable parameters
\def\iconsize{0.8cm}
\def\spacing{1.0cm}
% 2 Senior Operators (foreman)
\foreach \i in {0,1} {
\node at (\i*\spacing, 0) {\includegraphics[width=\iconsize]{images/2_state_of_the_art/foreman.png}};
}
% 2 Reactor Operators (worker)
\foreach \i in {0,1} {
\node at (\i*\spacing, -1.2cm) {\includegraphics[width=\iconsize]{images/2_state_of_the_art/worker.png}};
}
% Labels
\node[right] at (2.2*\spacing, 0) {\small 2 Senior Reactor Operators};
\node[right] at (2.2*\spacing, -1.2cm) {\small 2 Reactor Operators};
\end{tikzpicture}
}
% Onslide 2: Full staffing (6 shifts)
\only<3->{
\vspace{0.3cm}
\textbf{24/7 operations require \(\sim\)6 shifts:}
\vspace{0.1cm}
\begin{tikzpicture}
% Adjustable parameters
\def\iconsize{0.6cm}
\def\xspacing{0.8cm}
\def\yspacing{0.9cm}
% 12 Senior Operators (2 per shift <20> 6 shifts)
\foreach \row in {0,1} {
\foreach \col in {0,...,5} {
\node at (\col*\xspacing, -\row*\yspacing)
{\includegraphics[width=\iconsize]{images/2_state_of_the_art/foreman.png}};
}
}
% 12 Reactor Operators (2 per shift <20> 6 shifts)
\foreach \row in {2,3} {
\foreach \col in {0,...,5} {
\node at (\col*\xspacing, -\row*\yspacing)
{\includegraphics[width=\iconsize]{images/2_state_of_the_art/worker.png}};
}
}
% Labels
\node[right] at (6*\xspacing, -0.5*\yspacing) {\small 12 SROs};
\node[right] at (6*\xspacing, -2.5*\yspacing) {\small 12 ROs};
\end{tikzpicture}
\vspace{0.1cm}
\textbf{24 licensed operators per reactor}
}
% Onslide 3: Total for 100 reactors
\only<4->{
\vspace{0.3cm}
}
\end{column}
\end{columns}
\onslide<4->{ \large{ \textbf{To meet demand we require 2,400 new licensed
operators!} } }
\onslide<5>{
\alert{
\textit{We currently have only 3,600 licensed operators total...}
}
}
\end{frame}
\begin{frame}{Nuclear reactors are operated with prescriptive handbooks and
legacy control technologies}
\centering
\includegraphics[width=\textwidth,height=0.75\textheight,keepaspectratio]{images/2_state_of_the_art/control_room.jpg}
\end{frame}