\begin{frame}{Four primary risks with clear mitigation and contingency plans} \begin{enumerate} \item<1-> \alert<1>{\textbf{Computational Tractability of Synthesis}} \begin{itemize} \item[] \textit{Risk:} Synthesis times exceed project timeline \item[] \textit{Indicator:} $>$24hr for simplified procedures \item[] \textit{Contingency:} Reduce to minimal viable startup sequence \item[] \textit{Mitigation:} HPC resources, compositional verification \end{itemize} \item<2-> \alert<2>{\textbf{Discrete-Continuous Interface Complexity}} \begin{itemize} \item[] \textit{Risk:} Boolean guards cannot map to continuous dynamics \item[] \textit{Indicator:} No barrier certificates exist for transitions \item[] \textit{Contingency:} Restrict to polytopic invariants \item[] \textit{Mitigation:} Design controllers with transitions as constraints \end{itemize} \item<3-> \alert<3>{\textbf{Procedure Formalization Completeness}} \begin{itemize} \item[] \textit{Risk:} Procedures lack precision for autonomous control \item[] \textit{Indicator:} Multiple valid interpretations, operator judgment \item[] \textit{Contingency:} Document gaps as research contribution \item[] \textit{Mitigation:} Early analysis with domain experts \end{itemize} \item<4-> \alert<4>{\textbf{Hardware-in-the-Loop Integration}} \begin{itemize} \item[] \textit{Risk:} Real-time constraints incompatible with hardware \item[] \textit{Indicator:} Communication dropouts, missed deadlines \item[] \textit{Contingency:} Software-in-the-loop with timing analysis (TRL 4) \item[] \textit{Mitigation:} Early integration testing, ARCADE infrastructure \end{itemize} \end{enumerate} \end{frame} \begin{frame}{Staged structure ensures partial success yields valuable results} \begin{columns} \begin{column}{0.5\textwidth} \begin{block}{Early Detection} \small Each risk has specific indicators for early warning \begin{itemize} \item[] Quarterly assessment of progress \item[] Data-driven plan revision only when assumptions invalidated \end{itemize} \end{block} \end{column} \begin{column}{0.5\textwidth} \begin{block}{Research Value} \small Even contingency outcomes contribute knowledge \begin{itemize} \item[] Identifying barriers is itself valuable \item[] Clear pathway for future work \item[] Publishable results at each stage \end{itemize} \end{block} \end{column} \end{columns} \vspace{1cm} \begin{center} \textbf{Contingency plans preserve core methodology\\ while adjusting scope to maintain feasibility} \end{center} \end{frame}