Compare commits
2 Commits
568549999a
...
ded8626fa1
| Author | SHA1 | Date | |
|---|---|---|---|
| ded8626fa1 | |||
| 765bcf102f |
@ -114,3 +114,4 @@
|
|||||||
{"description":"edit State of the art","entry":"20251015T215116Z","modified":"20251015T215116Z","project":"ERLM","status":"pending","uuid":"fb11e8ef-4884-4e7e-b5fa-b00bb22c27d9"}
|
{"description":"edit State of the art","entry":"20251015T215116Z","modified":"20251015T215116Z","project":"ERLM","status":"pending","uuid":"fb11e8ef-4884-4e7e-b5fa-b00bb22c27d9"}
|
||||||
{"description":"Write whitepaper","due":"20251020T040000Z","entry":"20251015T215139Z","modified":"20251015T215139Z","project":"ERLM","status":"pending","uuid":"52b4cc9a-33c7-472b-b3b6-3e9504649e19","depends":["fb11e8ef-4884-4e7e-b5fa-b00bb22c27d9"]}
|
{"description":"Write whitepaper","due":"20251020T040000Z","entry":"20251015T215139Z","modified":"20251015T215139Z","project":"ERLM","status":"pending","uuid":"52b4cc9a-33c7-472b-b3b6-3e9504649e19","depends":["fb11e8ef-4884-4e7e-b5fa-b00bb22c27d9"]}
|
||||||
{"description":"Rewrite state of the art for nuclear controls engineering and hybrid systems","due":"20250929T040000Z","end":"20251015T215159Z","entry":"20250924T164019Z","modified":"20251015T215159Z","project":"ERLM","status":"completed","uuid":"e0636009-9061-47d0-9b59-1f2464a252a7","tags":["editing"]}
|
{"description":"Rewrite state of the art for nuclear controls engineering and hybrid systems","due":"20250929T040000Z","end":"20251015T215159Z","entry":"20250924T164019Z","modified":"20251015T215159Z","project":"ERLM","status":"completed","uuid":"e0636009-9061-47d0-9b59-1f2464a252a7","tags":["editing"]}
|
||||||
|
{"description":"projet:thesis Read NUREG 899","entry":"20251017T133407Z","modified":"20251017T133407Z","priority":"H","status":"pending","uuid":"f93124b9-0ec8-4aa2-8f5c-46337768bbc2","tags":["reading"]}
|
||||||
|
|||||||
@ -36,3 +36,4 @@
|
|||||||
[description:"Find out what 10 CFR is. Specifically, 10 CFR 50.34 and 10 CFR 55.59. Emergency Operating Procedures?" entry:"1760563307" modified:"1760563307" project:"thesis" status:"pending" uuid:"b0192186-bcbc-4d5c-a156-5e83fdfeda69"]
|
[description:"Find out what 10 CFR is. Specifically, 10 CFR 50.34 and 10 CFR 55.59. Emergency Operating Procedures?" entry:"1760563307" modified:"1760563307" project:"thesis" status:"pending" uuid:"b0192186-bcbc-4d5c-a156-5e83fdfeda69"]
|
||||||
[description:"edit State of the art" entry:"1760565076" modified:"1760565076" project:"ERLM" status:"pending" uuid:"fb11e8ef-4884-4e7e-b5fa-b00bb22c27d9"]
|
[description:"edit State of the art" entry:"1760565076" modified:"1760565076" project:"ERLM" status:"pending" uuid:"fb11e8ef-4884-4e7e-b5fa-b00bb22c27d9"]
|
||||||
[dep_fb11e8ef-4884-4e7e-b5fa-b00bb22c27d9:"x" depends:"fb11e8ef-4884-4e7e-b5fa-b00bb22c27d9" description:"Write whitepaper" due:"1760932800" entry:"1760565099" modified:"1760565099" project:"ERLM" status:"pending" uuid:"52b4cc9a-33c7-472b-b3b6-3e9504649e19"]
|
[dep_fb11e8ef-4884-4e7e-b5fa-b00bb22c27d9:"x" depends:"fb11e8ef-4884-4e7e-b5fa-b00bb22c27d9" description:"Write whitepaper" due:"1760932800" entry:"1760565099" modified:"1760565099" project:"ERLM" status:"pending" uuid:"52b4cc9a-33c7-472b-b3b6-3e9504649e19"]
|
||||||
|
[description:"projet:thesis Read NUREG 899" entry:"1760708047" modified:"1760708047" priority:"H" status:"pending" tags:"reading" tags_reading:"x" uuid:"f93124b9-0ec8-4aa2-8f5c-46337768bbc2"]
|
||||||
|
|||||||
@ -392,3 +392,6 @@ time 1760565119
|
|||||||
old [description:"Rewrite state of the art for nuclear controls engineering and hybrid systems" due:"1759118400" entry:"1758732019" modified:"1758732076" project:"ERLM" status:"pending" tags:"editing" tags_editing:"x" uuid:"e0636009-9061-47d0-9b59-1f2464a252a7"]
|
old [description:"Rewrite state of the art for nuclear controls engineering and hybrid systems" due:"1759118400" entry:"1758732019" modified:"1758732076" project:"ERLM" status:"pending" tags:"editing" tags_editing:"x" uuid:"e0636009-9061-47d0-9b59-1f2464a252a7"]
|
||||||
new [description:"Rewrite state of the art for nuclear controls engineering and hybrid systems" due:"1759118400" end:"1760565119" entry:"1758732019" modified:"1760565119" project:"ERLM" status:"completed" tags:"editing" tags_editing:"x" uuid:"e0636009-9061-47d0-9b59-1f2464a252a7"]
|
new [description:"Rewrite state of the art for nuclear controls engineering and hybrid systems" due:"1759118400" end:"1760565119" entry:"1758732019" modified:"1760565119" project:"ERLM" status:"completed" tags:"editing" tags_editing:"x" uuid:"e0636009-9061-47d0-9b59-1f2464a252a7"]
|
||||||
---
|
---
|
||||||
|
time 1760708047
|
||||||
|
new [description:"projet:thesis Read NUREG 899" entry:"1760708047" modified:"1760708047" priority:"H" status:"pending" tags:"reading" tags_reading:"x" uuid:"f93124b9-0ec8-4aa2-8f5c-46337768bbc2"]
|
||||||
|
---
|
||||||
|
|||||||
@ -33,6 +33,9 @@ responsibility under all conditions~\cite{Kemeny1979}. This tension
|
|||||||
between operational flexibility and safety assurance remains unresolved
|
between operational flexibility and safety assurance remains unresolved
|
||||||
in current practice.
|
in current practice.
|
||||||
|
|
||||||
|
<<<<<<< HEAD
|
||||||
|
%how are procedures tested
|
||||||
|
=======
|
||||||
Nuclear plant procedures exist in a hierarchy: normal operating procedures for
|
Nuclear plant procedures exist in a hierarchy: normal operating procedures for
|
||||||
routine operations, abnormal operating procedures for off-normal conditions,
|
routine operations, abnormal operating procedures for off-normal conditions,
|
||||||
Emergency Operating Procedures (EOPs) for design-basis accidents, Severe
|
Emergency Operating Procedures (EOPs) for design-basis accidents, Severe
|
||||||
@ -69,6 +72,7 @@ Safety systems instead operate with implemented automation. Reactor
|
|||||||
Protection Systems trip automatically on safety signals with millisecond
|
Protection Systems trip automatically on safety signals with millisecond
|
||||||
response times, and engineered safety features actuate automatically on accident
|
response times, and engineered safety features actuate automatically on accident
|
||||||
signals without operator action required.
|
signals without operator action required.
|
||||||
|
>>>>>>> 568549999a24c6a86f19411cbdf12b642057ade9
|
||||||
|
|
||||||
The current division between automated and human-controlled functions
|
The current division between automated and human-controlled functions
|
||||||
reveals the fundamental challenge of hybrid control. Highly
|
reveals the fundamental challenge of hybrid control. Highly
|
||||||
@ -90,6 +94,34 @@ decades of improvements in training and procedures, provides perhaps the
|
|||||||
most compelling motivation for formal automated control with
|
most compelling motivation for formal automated control with
|
||||||
mathematical safety guarantees.
|
mathematical safety guarantees.
|
||||||
|
|
||||||
|
<<<<<<< HEAD
|
||||||
|
%Whos in the control room
|
||||||
|
|
||||||
|
%how are reactor operators trained
|
||||||
|
|
||||||
|
% Humans are actually really bad at doing control
|
||||||
|
|
||||||
|
%most accidents are human error
|
||||||
|
|
||||||
|
%Three mile island
|
||||||
|
|
||||||
|
%Human factors probabilities
|
||||||
|
|
||||||
|
\subsection{HARDENS and Formal Methods}
|
||||||
|
% The NRC recognizes that automation and high assurance are important things to
|
||||||
|
% pursue
|
||||||
|
|
||||||
|
%They put out a grant to do rigorous digital engineering
|
||||||
|
|
||||||
|
%Won by formal methods group galois. Galois does a bunch of formal methods work.
|
||||||
|
%What is formal methods?
|
||||||
|
|
||||||
|
%Rigorous digital engineering to create a reactor trip system
|
||||||
|
|
||||||
|
%details of how it worked, and limitations therein
|
||||||
|
|
||||||
|
%Digital system ONLY
|
||||||
|
=======
|
||||||
Multiple independent analyses converge on a striking statistic: \textbf{70--80\%
|
Multiple independent analyses converge on a striking statistic: \textbf{70--80\%
|
||||||
of all nuclear power plant events are attributed to human error} versus
|
of all nuclear power plant events are attributed to human error} versus
|
||||||
approximately 20\% to equipment failures~\cite{DOE-HDBK-1028-2009,WNA2020}. More
|
approximately 20\% to equipment failures~\cite{DOE-HDBK-1028-2009,WNA2020}. More
|
||||||
@ -355,3 +387,4 @@ demonstrated by HARDENS, urgent safety imperatives documented by
|
|||||||
persistent human error statistics, and fundamental gaps in current
|
persistent human error statistics, and fundamental gaps in current
|
||||||
hybrid dynamics treatment creates a compelling and timely research
|
hybrid dynamics treatment creates a compelling and timely research
|
||||||
opportunity.
|
opportunity.
|
||||||
|
>>>>>>> 568549999a24c6a86f19411cbdf12b642057ade9
|
||||||
|
|||||||
Loading…
x
Reference in New Issue
Block a user