vault backup: 2025-05-29 16:40:00
This commit is contained in:
parent
122b554ef5
commit
a09ed157e0
@ -5,8 +5,8 @@ NUCE 2122 - Summer 2025
|
|||||||
Pick a metropolitan area in the US and identify the responsible electric utility.
|
Pick a metropolitan area in the US and identify the responsible electric utility.
|
||||||
For that utility, summarize the following based on internet information:
|
For that utility, summarize the following based on internet information:
|
||||||
|
|
||||||
1. Number, type, MWE rating and age of power plants producing electricity for
|
1. Number, type, MWE rating and age of power plants producing electricity
|
||||||
that utility
|
for that utility
|
||||||
2. Published strategy for new power plants to be added and plans for specific
|
2. Published strategy for new power plants to be added and plans for specific
|
||||||
plants to be shutdown
|
plants to be shutdown
|
||||||
3. % of gas fired plants compared to coal, nuclear, and resource energy*
|
3. % of gas fired plants compared to coal, nuclear, and resource energy*
|
||||||
@ -22,4 +22,9 @@ Portland General Electric share the eastern side of the metro area.
|
|||||||
|
|
||||||
Portland General Electric (PGE) will be the focus of this assignment, as they are the main supplier in Portland.
|
Portland General Electric (PGE) will be the focus of this assignment, as they are the main supplier in Portland.
|
||||||
|
|
||||||
PGE has
|
PGE has the following facility breakdown:
|
||||||
|
|
||||||
|
|
||||||
|
| Plant Type | Generation Capacity | % of Cap | Average Age |
|
||||||
|
| ---------- | ------------------- | -------- | ----------- |
|
||||||
|
| | | | |
|
||||||
|
|||||||
Loading…
x
Reference in New Issue
Block a user