Over the next five years, one of the most likely nuclear restarts will take place at Vermont Yankee in Vernon, Vermont. Originally closed in 2014 due to unfavorable market conditions and low wholesale power prices, Vermont Yankee benefited from a large hydroreservoir system built to balance its output. With the reactor offline, that infrastructure now runs primarily on fossilfuel peakers—an inherently less efficient use of the reservoirs storage capacity. New Englands regional grid operator forecasts roughly a 10percent increase in electricity demand by 2034, driven largely by electrification of heating and transportation. Although two new offshore wind farms are slated to fill much of that gap, both projects face political headwinds and possible delays under shifting federal administrations. At the same time, Vermont has limited options for additional purchased power imports; longterm agreements with HydroQuébec already run near capacity. The pending retirement or downscaling of several gasfired plants—once part of the Vermont utilitys reserve margin strategy—further tightens the regional fuel balance. Reviving Vermont Yankee would not only leverage existing transmission and reservoir assets but also hedge against potential shortfalls in renewables and gas supply, making a compelling case for relicensing and restart before 2030.
## ARC Tokamak Reactor
A second highprobability event involves the signing of a construction contract for the worlds first commercial fusion power plant in Virginia. Commonwealth Fusion Systems (CFS) has proposed the ARC tokamak, a 400MWe demonstration reactor, on land already zoned for energy innovation near Richmond. Unlike fission projects that require protracted federal reviews, ARC benefits from Virginias newly crafted statelevel regulatory framework for fusion, accelerating approval timelines. This site sits at the heart of a datacenter boom that is projected to triple power demand—from about 10GW today to 30GW by 2040—far outpacing available generation. While the PJM Interconnection can import limited grid support from neighboring states, those markets are also experiencing tight capacity margins as coal plants retire and solarproject rollouts have been partially curtailed due to interconnection backlogs. A stateapproved fusion contract, signed by 2026, would position Virginia not only to meet its own loadgrowth trajectory but also to export clean baseload into the PJM pool. The ARC reactor is highly dependent on the success of its precursor test reactor, SPARC, which is slated to begin operating in 2026. Even if ARCs timeline slips into the early 2030s, the combination of soaring datacenter demand, constrained renewable pipeline, and a supportive regulatory regime makes Virginia the prime candidate for a groundbreaking fusion construction start within the next five years.
A second highprobability event involves the signing of a construction contract for the worlds first commercial fusion power plant in Virginia. Commonwealth Fusion Systems (CFS) has proposed the ARC tokamak, a 400MWe demonstration reactor, on land already zoned for energy innovation near Richmond. Unlike fission projects that require protracted federal reviews, ARC benefits from Virginias newly crafted statelevel regulatory framework for fusion, accelerating approval timelines. This site sits at the heart of a datacenter boom that is projected to triple power demand—from about 10GW today to 30GW by 2040—far outpacing available generation. While the PJM Interconnection can import limited grid support from neighboring states, those markets are also experiencing tight capacity margins as coal plants retire and solarproject rollouts have been partially curtailed due to interconnection backlogs. A stateapproved fusion contract, signed by 2030, would help position Virginia not only to meet its own loadgrowth trajectory but also to export clean baseload into the PJM pool. The ARC reactor is highly dependent on the success of its precursor test reactor, SPARC, which is slated to begin operating in 2026. Even if ARCs timeline slips into the early to mid 2030s, the combination of soaring datacenter demand, constrained renewable pipeline, and a supportive regulatory regime makes Virginia the prime candidate for a groundbreaking fusion construction start within the next five years.