From 516dcc525407ed55e423d6805e225c550f782107 Mon Sep 17 00:00:00 2001 From: Dane Sabo Date: Wed, 16 Oct 2024 17:31:08 -0400 Subject: [PATCH] vault backup: 2024-10-16 17:31:08 --- 4 Qualifying Exam/2 Writing/2. QE State of the Art.md | 2 +- 1 file changed, 1 insertion(+), 1 deletion(-) diff --git a/4 Qualifying Exam/2 Writing/2. QE State of the Art.md b/4 Qualifying Exam/2 Writing/2. QE State of the Art.md index 40718a7d..5039aff4 100644 --- a/4 Qualifying Exam/2 Writing/2. QE State of the Art.md +++ b/4 Qualifying Exam/2 Writing/2. QE State of the Art.md @@ -31,7 +31,7 @@ where $e_m$ is the difference between the nominal mass and the actual as-built m **Limitation:** *Structured perturbations limit the form of perturbation possible to sample.* Because structured perturbations either are chosen a priori or through a parametric study, the form of possible perturbed plants is limited. Structured perturbations do not allow for unmodelled dynamics to be included as a possible perturbation. -The other type of uncertainty considered is unstructured uncertainty. This type of uncertainty does not assume a form and thus is able to capture unmodelled behavior in its robustness analysis. +The other type of uncertainty considered is unstructured uncertainty. This type of uncertainty does not assume a form and thus is able to capture unmodelled behavior in its robustness analysis. Unstructured sets are advantageous compared to structured sets for this reason. Robustness with respect (The disk multiplicative perturbation)