vault backup: 2025-05-29 14:07:26
This commit is contained in:
parent
5013a268b1
commit
3ed979b609
@ -1,3 +1,10 @@
|
|||||||
Dane Sabo
|
Dane Sabo
|
||||||
NUCE 2122 - Summer 2025
|
NUCE 2122 - Summer 2025
|
||||||
|
|
||||||
|
*Instructions:
|
||||||
|
Pick a metropolitan area in the US and identify the responsible electric utility.
|
||||||
|
For that utility, summarize the following based on internet information:
|
||||||
|
|
||||||
|
1. Number, type, MWE rating and age of power plants producing electricity for
|
||||||
|
that utility
|
||||||
|
2. *
|
||||||
Loading…
x
Reference in New Issue
Block a user