vault backup: 2024-10-16 16:38:44
This commit is contained in:
parent
d59c97a2bb
commit
1338f9f7a3
@ -29,8 +29,6 @@ b_{min} \leq b +e_b \leq b_{max} \\
|
|||||||
k_{min} \leq k +e_k \leq k_{max}} $$
|
k_{min} \leq k +e_k \leq k_{max}} $$
|
||||||
where $e_m$ is the difference between the nominal mass and the actual as-built mass. $e_b$ and $e_k$ follow similar logic. Structured perturbations are easy to use to create perturbed plants: simply pick values for $e_m$, $e_b$, and $e_k$ that are within the allowable bounds and plug them in to create a new, perturbed transfer function.
|
where $e_m$ is the difference between the nominal mass and the actual as-built mass. $e_b$ and $e_k$ follow similar logic. Structured perturbations are easy to use to create perturbed plants: simply pick values for $e_m$, $e_b$, and $e_k$ that are within the allowable bounds and plug them in to create a new, perturbed transfer function.
|
||||||
|
|
||||||
Structured perturbations allow for sampling of the set, but they do have a significant drawback. Structured perturbations severely restrict
|
|
||||||
|
|
||||||
Structured perturbations do suffer from a limit
|
Structured perturbations do suffer from a limit
|
||||||
(The disk multiplicative perturbation)
|
(The disk multiplicative perturbation)
|
||||||
|
|
||||||
|
|||||||
Loading…
x
Reference in New Issue
Block a user