Auto sync: 2025-12-02 09:04:28 (16 files changed)

A  .claude/commands/writing-review.md

M  .task/backlog.data

M  .task/completed.data

M  .task/pending.data

M  .task/undo.data

A  ERLM-Proposal-Review-Detailed.md

A  ERLM-Proposal-Review-Summary.md

A  Presentations/ERLM/ERLM_SABO_DRAFT_PRES.pdf
This commit is contained in:
Dane Sabo 2025-12-02 09:04:28 -05:00
parent 3cce441728
commit 73a87c044d
16 changed files with 4589 additions and 48 deletions

View File

@ -0,0 +1,157 @@
---
description: Comprehensive multi-level writing review using Gopen's Sense of Structure framework
---
You are a writing expert specializing in Gopen's "Sense of Structure" framework for scientific and technical writing. Conduct a comprehensive review of the specified document(s) at multiple levels: sentence-level (stress position, topic position, flow), paragraph-level (point-issue structure, topic strings, unity), section-level (organization, argument development), and big-picture (narrative arc, rhetorical strategy, content gaps).
## Task
The user will provide:
1. **Path to document(s)**: File or directory containing the writing to review (e.g., `.tex`, `.md`, `.txt` files)
2. **Output location** (optional): Where to save review documents (defaults to vault root)
3. **Focus areas** (optional): Specific sections to emphasize or de-emphasize
## Process
### Phase 1: Read and Analyze
1. Read all specified documents thoroughly
2. Analyze at four levels:
- **Sentence-level**: Stress position, topic position, flow, clarity, passive voice, nominalizations
- **Paragraph-level**: Point-issue structure, topic strings, unity, transitions
- **Section-level**: Organization, argument development, technical content
- **Big picture**: Narrative arc, rhetorical strategy, consistency, gaps
3. Identify recurring patterns (not just isolated issues)
### Phase 2: Create Two Documents
#### Document 1: Executive Summary (`[basename]-Review-Summary.md`)
**Target**: 15-20 minute read, balanced overview
Structure:
```markdown
# [Document Name] Writing Review - Executive Summary
## Overview
- Strengths summary
- Priority areas for revision
## Priority Issues (Top 10)
Ranked by impact with specific recommendations
## Key Patterns Identified
For each pattern (5-8 total):
- **Pattern Name**
- Principle (Gopen's framework explanation)
- Representative example with location
- Current text quoted
- Issue explained
- Concrete fix demonstrated
- List of similar instances
## Section-Level Issues
Major content/organization concerns per section
## Big Picture Observations
Narrative, rhetoric, strategy, gaps
## Gopen Framework Quick Reference
Brief explanations of key concepts used
```
#### Document 2: Comprehensive Detail (`[basename]-Review-Detailed.md`)
**Target**: Every issue with checkboxes for tracking
Structure:
```markdown
# [Document Name] Writing Review - Comprehensive Detail
## How to Use This Document
- Each issue has a checkbox for tracking progress
- Cross-references to Summary doc for patterns
- Work section-by-section
## [Section 1 Name]
### Sentence-Level Issues
- [ ] **Line X-Y**: Issue description
- Current: [quoted text]
- Issue: [explanation]
- See Summary: [Pattern name]
- Fix: [suggested revision]
### Paragraph-Level Issues
- [ ] **Paragraph starting line X**: Issue description
- [details]
### Content Issues
- [ ] **Major issue description**
- [details]
[Repeat for all sections]
## Big Picture Issues
- [ ] Cross-cutting issues
- [ ] Consistency problems
- [ ] Missing elements
```
### Phase 3: Revision Style
Use "Principles + Examples" approach:
1. Explain the principle (Gopen's framework)
2. Show representative example with specific fix
3. Note similar instances elsewhere
4. Let user apply principle to similar cases
## Gopen's Sense of Structure Framework
Apply these principles throughout your analysis:
**Stress Position**: The end of a sentence should contain the most important new information. Readers expect climax there.
**Topic Position**: The beginning of a sentence should contain familiar information that links to what came before. Creates flow.
**Point-Issue Structure**: Paragraphs should open by stating (1) the point/claim and (2) why it matters (the issue), before providing supporting detail.
**Topic String**: The chain of topics across sentences in a paragraph. Strong topic strings create coherence.
**Old → New Information Flow**: Information should flow from familiar (old) to unfamiliar (new) within sentences and paragraphs.
## Guidelines
- **Be specific**: Always quote current text and provide line numbers
- **Be constructive**: Frame issues as opportunities, not failures
- **Identify patterns**: Group similar issues rather than listing every instance
- **Prioritize**: Rank by impact on reader comprehension and persuasiveness
- **Balance**: Note strengths as well as issues
- **Cross-reference**: Link detailed issues back to patterns in summary
## Example Interaction
```
User: /writing-review Writing/MyPaper
Assistant: I'll conduct a comprehensive writing review of your paper. Let me read through all the documents first...
[Reads all files]
I'm now analyzing at four levels and identifying patterns. This will take a few moments...
[Creates both documents]
I've completed the review and created two documents:
1. **MyPaper-Review-Summary.md** - Executive overview with top 10 issues and key patterns
2. **MyPaper-Review-Detailed.md** - Comprehensive review with 150+ checkboxed items
**Key Findings**: [brief summary]
**Priority Issues**: [top 3]
**Next Steps**: [recommendation]
```
## Notes
- Focus on clarity, flow, and rhetorical effectiveness
- Use Gopen's terminology consistently
- Provide concrete, actionable suggestions
- Maintain positive, constructive tone
- Document both what works well and what needs improvement

View File

@ -329,3 +329,29 @@
{"description":"Get information from FSAE about job placements and a couple sentences about their value for the website","due":"20251126T050000Z","entry":"20251121T184558Z","modified":"20251121T184558Z","project":"Chair-Search","status":"pending","uuid":"fb997f7c-c3d8-4f3c-b02c-f6d55cc9b1c8"} {"description":"Get information from FSAE about job placements and a couple sentences about their value for the website","due":"20251126T050000Z","entry":"20251121T184558Z","modified":"20251121T184558Z","project":"Chair-Search","status":"pending","uuid":"fb997f7c-c3d8-4f3c-b02c-f6d55cc9b1c8"}
{"description":"Make list of tasks for contact about student groups","due":"20251126T050000Z","entry":"20251121T184623Z","modified":"20251121T184623Z","project":"Chair-Search","status":"pending","uuid":"0addf099-132c-41af-90d8-19f5f9a9c832"} {"description":"Make list of tasks for contact about student groups","due":"20251126T050000Z","entry":"20251121T184623Z","modified":"20251121T184623Z","project":"Chair-Search","status":"pending","uuid":"0addf099-132c-41af-90d8-19f5f9a9c832"}
{"description":"How do we handle numerical barriers when creating discrete automata?","entry":"20251124T170306Z","modified":"20251124T170306Z","project":"Thesis","status":"pending","uuid":"1f202b4d-6925-46a2-9b61-029312d61635","tags":["question"]} {"description":"How do we handle numerical barriers when creating discrete automata?","entry":"20251124T170306Z","modified":"20251124T170306Z","project":"Thesis","status":"pending","uuid":"1f202b4d-6925-46a2-9b61-029312d61635","tags":["question"]}
{"description":"Draft Presentations","due":"20251122T045900Z","end":"20251202T131335Z","entry":"20251111T184241Z","modified":"20251202T131335Z","project":"ERLM","status":"completed","uuid":"aa7dde10-50d7-4e92-8732-e9f97e049fd9"}
{"description":"ERLM proposal due","due":"20251206T050000Z","entry":"20251202T131547Z","modified":"20251202T131547Z","status":"pending","uuid":"f6968367-96f1-4ce2-8691-e45423e27456"}
{"description":"NUCE2101 final exam","due":"20251209T050000Z","entry":"20251202T131547Z","modified":"20251202T131547Z","status":"pending","uuid":"a6420590-c2a5-4b74-b216-70b8faebb7c5"}
{"description":"ERLM final presentation","due":"20251209T050000Z","entry":"20251202T131547Z","modified":"20251202T131547Z","status":"pending","uuid":"1dd77b21-3931-46fb-97b5-7fc0b19bb3a6"}
{"description":"ERLM proposal due","due":"20251206T050000Z","entry":"20251202T131547Z","modified":"20251202T131656Z","project":"ERLM","status":"pending","uuid":"f6968367-96f1-4ce2-8691-e45423e27456","tags":["writing"]}
{"description":"NUCE2101 final exam","due":"20251209T050000Z","entry":"20251202T131547Z","modified":"20251202T131656Z","project":"NUCE2101","status":"pending","uuid":"a6420590-c2a5-4b74-b216-70b8faebb7c5"}
{"description":"ERLM final presentation","due":"20251209T050000Z","entry":"20251202T131547Z","modified":"20251202T131656Z","project":"ERLM","status":"pending","uuid":"1dd77b21-3931-46fb-97b5-7fc0b19bb3a6"}
{"description":"Review interview questions","due":"20251203T050000Z","entry":"20251121T184207Z","modified":"20251202T131748Z","project":"Chair-Search","status":"pending","uuid":"1156892a-3889-4b9d-baea-01e4802fd755"}
{"description":"Get information from FSAE about job placements and a couple sentences about their value for the website","due":"20251203T050000Z","entry":"20251121T184558Z","modified":"20251202T131748Z","project":"Chair-Search","status":"pending","uuid":"fb997f7c-c3d8-4f3c-b02c-f6d55cc9b1c8"}
{"description":"Make list of tasks for contact about student groups","due":"20251126T050000Z","end":"20251202T131911Z","entry":"20251121T184623Z","modified":"20251202T131911Z","project":"Chair-Search","status":"completed","uuid":"0addf099-132c-41af-90d8-19f5f9a9c832"}
{"description":"Reach out to SOAR for job placement info and website content","due":"20251204T050000Z","entry":"20251202T131911Z","modified":"20251202T131911Z","project":"Chair-Search","status":"pending","uuid":"535c2ffc-f233-46f0-ac33-a93cbfd12f81"}
{"description":"Reach out to Material Advantage for job placement info and website content","due":"20251204T050000Z","entry":"20251202T131911Z","modified":"20251202T131911Z","project":"Chair-Search","status":"pending","uuid":"00072514-5622-4a44-9826-49690be83767"}
{"description":"Reach out to FSAE for job placement info and website content","due":"20251204T050000Z","entry":"20251202T131911Z","modified":"20251202T131911Z","project":"Chair-Search","status":"pending","uuid":"ca5f0450-483f-4a93-aba1-d06e71b4df5c"}
{"description":"Get information from FSAE about job placements and a couple sentences about their value for the website","due":"20251203T050000Z","end":"20251202T131947Z","entry":"20251121T184558Z","modified":"20251202T131950Z","project":"Chair-Search","status":"deleted","uuid":"fb997f7c-c3d8-4f3c-b02c-f6d55cc9b1c8"}
{"description":"Review and edit Goals and Outcomes section","due":"20251205T050000Z","entry":"20251202T132235Z","modified":"20251202T132235Z","project":"ERLM","status":"pending","uuid":"0888fdb8-f5cd-4374-a589-b7b3c1bbd472","tags":["editing"]}
{"description":"Review and edit State of the Art section","due":"20251205T050000Z","entry":"20251202T132235Z","modified":"20251202T132235Z","project":"ERLM","status":"pending","uuid":"0d921ea2-6211-4cd8-bbc4-4f9bf36794d3","tags":["editing"]}
{"description":"Review and edit Research Approach section","due":"20251205T050000Z","entry":"20251202T132235Z","modified":"20251202T132235Z","project":"ERLM","status":"pending","uuid":"9ce7d23c-0f56-49af-b97d-a684966cfbae","tags":["editing"]}
{"description":"Review and edit Metrics of Success section","due":"20251205T050000Z","entry":"20251202T132235Z","modified":"20251202T132235Z","project":"ERLM","status":"pending","uuid":"29cc8c63-1fb7-4523-9953-603467b929ee","tags":["editing"]}
{"description":"Review and edit Risks and Contingencies section","due":"20251205T050000Z","entry":"20251202T132235Z","modified":"20251202T132235Z","project":"ERLM","status":"pending","uuid":"e354ab0c-cef7-41e2-bfb4-d98886e512b7","tags":["editing"]}
{"description":"Review and edit Broader Impacts section","due":"20251205T050000Z","entry":"20251202T132236Z","modified":"20251202T132236Z","project":"ERLM","status":"pending","uuid":"d1fa2409-2f2f-4855-81be-14ee617df5d2","tags":["editing"]}
{"description":"Review and edit Budget section","due":"20251205T050000Z","entry":"20251202T132236Z","modified":"20251202T132236Z","project":"ERLM","status":"pending","uuid":"689420d6-7191-42b6-b691-94ad39c8e0dd","tags":["editing"]}
{"description":"Review and edit Schedule section","due":"20251205T050000Z","entry":"20251202T132236Z","modified":"20251202T132236Z","project":"ERLM","status":"pending","uuid":"14fee599-fe0f-4773-90fc-c5f78291f425","tags":["editing"]}
{"description":"Verify RFP compliance for all sections","due":"20251205T050000Z","entry":"20251202T132246Z","modified":"20251202T132246Z","project":"ERLM","status":"pending","uuid":"a4c027fa-f50d-4efc-ab61-5b8054810a80","tags":["editing"]}
{"description":"Final proofread and polish entire proposal","due":"20251205T050000Z","entry":"20251202T132246Z","modified":"20251202T132246Z","project":"ERLM","status":"pending","uuid":"5ba3929b-5ec3-4c9d-b30e-30fd8fe20b54","tags":["editing"]}
{"description":"Compile and generate final PDF","due":"20251205T050000Z","entry":"20251202T132246Z","modified":"20251202T132246Z","project":"ERLM","status":"pending","uuid":"2a8e9294-aecc-434a-b5dd-a468baf8f4a8"}
{"description":"ERLM proposal due","due":"20251206T050000Z","entry":"20251202T131547Z","modified":"20251202T132329Z","project":"ERLM","status":"pending","uuid":"f6968367-96f1-4ce2-8691-e45423e27456","tags":["writing"],"depends":["0888fdb8-f5cd-4374-a589-b7b3c1bbd472","0d921ea2-6211-4cd8-bbc4-4f9bf36794d3","14fee599-fe0f-4773-90fc-c5f78291f425","29cc8c63-1fb7-4523-9953-603467b929ee","2a8e9294-aecc-434a-b5dd-a468baf8f4a8","5ba3929b-5ec3-4c9d-b30e-30fd8fe20b54","689420d6-7191-42b6-b691-94ad39c8e0dd","9ce7d23c-0f56-49af-b97d-a684966cfbae","a4c027fa-f50d-4efc-ab61-5b8054810a80","d1fa2409-2f2f-4855-81be-14ee617df5d2","e354ab0c-cef7-41e2-bfb4-d98886e512b7"]}

View File

@ -1,3 +1,6 @@
[description:"Get information from FSAE about job placements and a couple sentences about their value for the website" due:"1764738000" end:"1764681587" entry:"1763750758" modified:"1764681590" project:"Chair-Search" status:"deleted" uuid:"fb997f7c-c3d8-4f3c-b02c-f6d55cc9b1c8"]
[description:"Make list of tasks for contact about student groups" due:"1764133200" end:"1764681551" entry:"1763750783" modified:"1764681551" project:"Chair-Search" status:"completed" uuid:"0addf099-132c-41af-90d8-19f5f9a9c832"]
[description:"Draft Presentations" due:"1763787540" end:"1764681215" entry:"1762886561" modified:"1764681215" project:"ERLM" status:"completed" uuid:"aa7dde10-50d7-4e92-8732-e9f97e049fd9"]
[description:"finish peer reviews" end:"1763573238" entry:"1763572166" modified:"1763573238" project:"ERLM" status:"completed" uuid:"6d9589a6-37d9-4447-aaa4-197affc63409"] [description:"finish peer reviews" end:"1763573238" entry:"1763572166" modified:"1763573238" project:"ERLM" status:"completed" uuid:"6d9589a6-37d9-4447-aaa4-197affc63409"]
[description:"Submit enrollment form to Antoine" due:"1763355600" end:"1763572130" entry:"1762974895" modified:"1763572130" status:"completed" uuid:"86401e85-9e08-4451-b609-007f264fc83b"] [description:"Submit enrollment form to Antoine" due:"1763355600" end:"1763572130" entry:"1762974895" modified:"1763572130" status:"completed" uuid:"86401e85-9e08-4451-b609-007f264fc83b"]
[description:"Add Karniadakis to list of candidates" end:"1763572137" entry:"1763063184" modified:"1763572146" project:"Chair-Search" status:"deleted" uuid:"b505a96b-5e89-4fb6-9ec8-617e38101bcf"] [description:"Add Karniadakis to list of candidates" end:"1763572137" entry:"1763063184" modified:"1763572146" project:"Chair-Search" status:"deleted" uuid:"b505a96b-5e89-4fb6-9ec8-617e38101bcf"]

View File

@ -57,10 +57,24 @@
[description:"project zk.perm Heat Removal" entry:"1761852415" modified:"1761852541" project:"zk.perm" status:"pending" uuid:"e77893e0-5ba6-4dcb-bdb0-4828845c64fe"] [description:"project zk.perm Heat Removal" entry:"1761852415" modified:"1761852541" project:"zk.perm" status:"pending" uuid:"e77893e0-5ba6-4dcb-bdb0-4828845c64fe"]
[description:"project zk.perm Reactor Coolant Inventory Control" entry:"1761852439" modified:"1761852541" project:"zk.perm" status:"pending" uuid:"8e9a01f7-fe14-4a41-a085-0d99d8e0f03e"] [description:"project zk.perm Reactor Coolant Inventory Control" entry:"1761852439" modified:"1761852541" project:"zk.perm" status:"pending" uuid:"8e9a01f7-fe14-4a41-a085-0d99d8e0f03e"]
[description:"Review Simeonas comments and implement them\n" entry:"1762182404" modified:"1762182404" project:"ERLM" status:"pending" tags:"editing" tags_editing:"x" uuid:"4f55e685-ed77-4533-9865-2ebe64b80632"] [description:"Review Simeonas comments and implement them\n" entry:"1762182404" modified:"1762182404" project:"ERLM" status:"pending" tags:"editing" tags_editing:"x" uuid:"4f55e685-ed77-4533-9865-2ebe64b80632"]
[description:"Draft Presentations" due:"1763787540" entry:"1762886561" modified:"1762886561" project:"ERLM" status:"pending" uuid:"aa7dde10-50d7-4e92-8732-e9f97e049fd9"]
[description:"Tune up state of the art for Proposal" due:"1764997140" entry:"1762886561" modified:"1762886561" project:"ERLM" status:"pending" uuid:"953a73fa-aadc-4112-bf98-7a4825068053"] [description:"Tune up state of the art for Proposal" due:"1764997140" entry:"1762886561" modified:"1762886561" project:"ERLM" status:"pending" uuid:"953a73fa-aadc-4112-bf98-7a4825068053"]
[description:"Final Presentations" due:"1765213200" entry:"1762886561" modified:"1762886561" project:"ERLM" status:"pending" uuid:"538a2b60-16d5-4033-a40f-d45653b9a5a5"] [description:"Final Presentations" due:"1765213200" entry:"1762886561" modified:"1762886561" project:"ERLM" status:"pending" uuid:"538a2b60-16d5-4033-a40f-d45653b9a5a5"]
[description:"Review interview questions" due:"1763960400" entry:"1763750527" modified:"1763750527" project:"Chair-Search" status:"pending" uuid:"1156892a-3889-4b9d-baea-01e4802fd755"] [description:"Review interview questions" due:"1764738000" entry:"1763750527" modified:"1764681468" project:"Chair-Search" status:"pending" uuid:"1156892a-3889-4b9d-baea-01e4802fd755"]
[description:"Get information from FSAE about job placements and a couple sentences about their value for the website" due:"1764133200" entry:"1763750758" modified:"1763750758" project:"Chair-Search" status:"pending" uuid:"fb997f7c-c3d8-4f3c-b02c-f6d55cc9b1c8"]
[description:"Make list of tasks for contact about student groups" due:"1764133200" entry:"1763750783" modified:"1763750783" project:"Chair-Search" status:"pending" uuid:"0addf099-132c-41af-90d8-19f5f9a9c832"]
[description:"How do we handle numerical barriers when creating discrete automata?" entry:"1764003786" modified:"1764003786" project:"Thesis" status:"pending" tags:"question" tags_question:"x" uuid:"1f202b4d-6925-46a2-9b61-029312d61635"] [description:"How do we handle numerical barriers when creating discrete automata?" entry:"1764003786" modified:"1764003786" project:"Thesis" status:"pending" tags:"question" tags_question:"x" uuid:"1f202b4d-6925-46a2-9b61-029312d61635"]
[dep_0888fdb8-f5cd-4374-a589-b7b3c1bbd472:"x" dep_0d921ea2-6211-4cd8-bbc4-4f9bf36794d3:"x" dep_14fee599-fe0f-4773-90fc-c5f78291f425:"x" dep_29cc8c63-1fb7-4523-9953-603467b929ee:"x" dep_2a8e9294-aecc-434a-b5dd-a468baf8f4a8:"x" dep_5ba3929b-5ec3-4c9d-b30e-30fd8fe20b54:"x" dep_689420d6-7191-42b6-b691-94ad39c8e0dd:"x" dep_9ce7d23c-0f56-49af-b97d-a684966cfbae:"x" dep_a4c027fa-f50d-4efc-ab61-5b8054810a80:"x" dep_d1fa2409-2f2f-4855-81be-14ee617df5d2:"x" dep_e354ab0c-cef7-41e2-bfb4-d98886e512b7:"x" depends:"0888fdb8-f5cd-4374-a589-b7b3c1bbd472,0d921ea2-6211-4cd8-bbc4-4f9bf36794d3,14fee599-fe0f-4773-90fc-c5f78291f425,29cc8c63-1fb7-4523-9953-603467b929ee,2a8e9294-aecc-434a-b5dd-a468baf8f4a8,5ba3929b-5ec3-4c9d-b30e-30fd8fe20b54,689420d6-7191-42b6-b691-94ad39c8e0dd,9ce7d23c-0f56-49af-b97d-a684966cfbae,a4c027fa-f50d-4efc-ab61-5b8054810a80,d1fa2409-2f2f-4855-81be-14ee617df5d2,e354ab0c-cef7-41e2-bfb4-d98886e512b7" description:"ERLM proposal due" due:"1764997200" entry:"1764681347" modified:"1764681809" project:"ERLM" status:"pending" tags:"writing" tags_writing:"x" uuid:"f6968367-96f1-4ce2-8691-e45423e27456"]
[description:"NUCE2101 final exam" due:"1765256400" entry:"1764681347" modified:"1764681416" project:"NUCE2101" status:"pending" uuid:"a6420590-c2a5-4b74-b216-70b8faebb7c5"]
[description:"ERLM final presentation" due:"1765256400" entry:"1764681347" modified:"1764681416" project:"ERLM" status:"pending" uuid:"1dd77b21-3931-46fb-97b5-7fc0b19bb3a6"]
[description:"Reach out to SOAR for job placement info and website content" due:"1764824400" entry:"1764681551" modified:"1764681551" project:"Chair-Search" status:"pending" uuid:"535c2ffc-f233-46f0-ac33-a93cbfd12f81"]
[description:"Reach out to Material Advantage for job placement info and website content" due:"1764824400" entry:"1764681551" modified:"1764681551" project:"Chair-Search" status:"pending" uuid:"00072514-5622-4a44-9826-49690be83767"]
[description:"Reach out to FSAE for job placement info and website content" due:"1764824400" entry:"1764681551" modified:"1764681551" project:"Chair-Search" status:"pending" uuid:"ca5f0450-483f-4a93-aba1-d06e71b4df5c"]
[description:"Review and edit Goals and Outcomes section" due:"1764910800" entry:"1764681755" modified:"1764681755" project:"ERLM" status:"pending" tags:"editing" tags_editing:"x" uuid:"0888fdb8-f5cd-4374-a589-b7b3c1bbd472"]
[description:"Review and edit State of the Art section" due:"1764910800" entry:"1764681755" modified:"1764681755" project:"ERLM" status:"pending" tags:"editing" tags_editing:"x" uuid:"0d921ea2-6211-4cd8-bbc4-4f9bf36794d3"]
[description:"Review and edit Research Approach section" due:"1764910800" entry:"1764681755" modified:"1764681755" project:"ERLM" status:"pending" tags:"editing" tags_editing:"x" uuid:"9ce7d23c-0f56-49af-b97d-a684966cfbae"]
[description:"Review and edit Metrics of Success section" due:"1764910800" entry:"1764681755" modified:"1764681755" project:"ERLM" status:"pending" tags:"editing" tags_editing:"x" uuid:"29cc8c63-1fb7-4523-9953-603467b929ee"]
[description:"Review and edit Risks and Contingencies section" due:"1764910800" entry:"1764681755" modified:"1764681755" project:"ERLM" status:"pending" tags:"editing" tags_editing:"x" uuid:"e354ab0c-cef7-41e2-bfb4-d98886e512b7"]
[description:"Review and edit Broader Impacts section" due:"1764910800" entry:"1764681756" modified:"1764681756" project:"ERLM" status:"pending" tags:"editing" tags_editing:"x" uuid:"d1fa2409-2f2f-4855-81be-14ee617df5d2"]
[description:"Review and edit Budget section" due:"1764910800" entry:"1764681756" modified:"1764681756" project:"ERLM" status:"pending" tags:"editing" tags_editing:"x" uuid:"689420d6-7191-42b6-b691-94ad39c8e0dd"]
[description:"Review and edit Schedule section" due:"1764910800" entry:"1764681756" modified:"1764681756" project:"ERLM" status:"pending" tags:"editing" tags_editing:"x" uuid:"14fee599-fe0f-4773-90fc-c5f78291f425"]
[description:"Verify RFP compliance for all sections" due:"1764910800" entry:"1764681766" modified:"1764681766" project:"ERLM" status:"pending" tags:"editing" tags_editing:"x" uuid:"a4c027fa-f50d-4efc-ab61-5b8054810a80"]
[description:"Final proofread and polish entire proposal" due:"1764910800" entry:"1764681766" modified:"1764681766" project:"ERLM" status:"pending" tags:"editing" tags_editing:"x" uuid:"5ba3929b-5ec3-4c9d-b30e-30fd8fe20b54"]
[description:"Compile and generate final PDF" due:"1764910800" entry:"1764681766" modified:"1764681766" project:"ERLM" status:"pending" uuid:"2a8e9294-aecc-434a-b5dd-a468baf8f4a8"]

View File

@ -1179,3 +1179,90 @@ new [description:"Make list of tasks for contact about student groups" due:"1764
time 1764003786 time 1764003786
new [description:"How do we handle numerical barriers when creating discrete automata?" entry:"1764003786" modified:"1764003786" project:"Thesis" status:"pending" tags:"question" tags_question:"x" uuid:"1f202b4d-6925-46a2-9b61-029312d61635"] new [description:"How do we handle numerical barriers when creating discrete automata?" entry:"1764003786" modified:"1764003786" project:"Thesis" status:"pending" tags:"question" tags_question:"x" uuid:"1f202b4d-6925-46a2-9b61-029312d61635"]
--- ---
time 1764681215
old [description:"Draft Presentations" due:"1763787540" entry:"1762886561" modified:"1762886561" project:"ERLM" status:"pending" uuid:"aa7dde10-50d7-4e92-8732-e9f97e049fd9"]
new [description:"Draft Presentations" due:"1763787540" end:"1764681215" entry:"1762886561" modified:"1764681215" project:"ERLM" status:"completed" uuid:"aa7dde10-50d7-4e92-8732-e9f97e049fd9"]
---
time 1764681347
new [description:"ERLM proposal due" due:"1764997200" entry:"1764681347" modified:"1764681347" status:"pending" uuid:"f6968367-96f1-4ce2-8691-e45423e27456"]
---
time 1764681347
new [description:"NUCE2101 final exam" due:"1765256400" entry:"1764681347" modified:"1764681347" status:"pending" uuid:"a6420590-c2a5-4b74-b216-70b8faebb7c5"]
---
time 1764681347
new [description:"ERLM final presentation" due:"1765256400" entry:"1764681347" modified:"1764681347" status:"pending" uuid:"1dd77b21-3931-46fb-97b5-7fc0b19bb3a6"]
---
time 1764681416
old [description:"ERLM proposal due" due:"1764997200" entry:"1764681347" modified:"1764681347" status:"pending" uuid:"f6968367-96f1-4ce2-8691-e45423e27456"]
new [description:"ERLM proposal due" due:"1764997200" entry:"1764681347" modified:"1764681416" project:"ERLM" status:"pending" tags:"writing" tags_writing:"x" uuid:"f6968367-96f1-4ce2-8691-e45423e27456"]
---
time 1764681416
old [description:"NUCE2101 final exam" due:"1765256400" entry:"1764681347" modified:"1764681347" status:"pending" uuid:"a6420590-c2a5-4b74-b216-70b8faebb7c5"]
new [description:"NUCE2101 final exam" due:"1765256400" entry:"1764681347" modified:"1764681416" project:"NUCE2101" status:"pending" uuid:"a6420590-c2a5-4b74-b216-70b8faebb7c5"]
---
time 1764681416
old [description:"ERLM final presentation" due:"1765256400" entry:"1764681347" modified:"1764681347" status:"pending" uuid:"1dd77b21-3931-46fb-97b5-7fc0b19bb3a6"]
new [description:"ERLM final presentation" due:"1765256400" entry:"1764681347" modified:"1764681416" project:"ERLM" status:"pending" uuid:"1dd77b21-3931-46fb-97b5-7fc0b19bb3a6"]
---
time 1764681468
old [description:"Review interview questions" due:"1763960400" entry:"1763750527" modified:"1763750527" project:"Chair-Search" status:"pending" uuid:"1156892a-3889-4b9d-baea-01e4802fd755"]
new [description:"Review interview questions" due:"1764738000" entry:"1763750527" modified:"1764681468" project:"Chair-Search" status:"pending" uuid:"1156892a-3889-4b9d-baea-01e4802fd755"]
---
time 1764681468
old [description:"Get information from FSAE about job placements and a couple sentences about their value for the website" due:"1764133200" entry:"1763750758" modified:"1763750758" project:"Chair-Search" status:"pending" uuid:"fb997f7c-c3d8-4f3c-b02c-f6d55cc9b1c8"]
new [description:"Get information from FSAE about job placements and a couple sentences about their value for the website" due:"1764738000" entry:"1763750758" modified:"1764681468" project:"Chair-Search" status:"pending" uuid:"fb997f7c-c3d8-4f3c-b02c-f6d55cc9b1c8"]
---
time 1764681551
old [description:"Make list of tasks for contact about student groups" due:"1764133200" entry:"1763750783" modified:"1763750783" project:"Chair-Search" status:"pending" uuid:"0addf099-132c-41af-90d8-19f5f9a9c832"]
new [description:"Make list of tasks for contact about student groups" due:"1764133200" end:"1764681551" entry:"1763750783" modified:"1764681551" project:"Chair-Search" status:"completed" uuid:"0addf099-132c-41af-90d8-19f5f9a9c832"]
---
time 1764681551
new [description:"Reach out to SOAR for job placement info and website content" due:"1764824400" entry:"1764681551" modified:"1764681551" project:"Chair-Search" status:"pending" uuid:"535c2ffc-f233-46f0-ac33-a93cbfd12f81"]
---
time 1764681551
new [description:"Reach out to Material Advantage for job placement info and website content" due:"1764824400" entry:"1764681551" modified:"1764681551" project:"Chair-Search" status:"pending" uuid:"00072514-5622-4a44-9826-49690be83767"]
---
time 1764681551
new [description:"Reach out to FSAE for job placement info and website content" due:"1764824400" entry:"1764681551" modified:"1764681551" project:"Chair-Search" status:"pending" uuid:"ca5f0450-483f-4a93-aba1-d06e71b4df5c"]
---
time 1764681590
old [description:"Get information from FSAE about job placements and a couple sentences about their value for the website" due:"1764738000" entry:"1763750758" modified:"1764681468" project:"Chair-Search" status:"pending" uuid:"fb997f7c-c3d8-4f3c-b02c-f6d55cc9b1c8"]
new [description:"Get information from FSAE about job placements and a couple sentences about their value for the website" due:"1764738000" end:"1764681587" entry:"1763750758" modified:"1764681590" project:"Chair-Search" status:"deleted" uuid:"fb997f7c-c3d8-4f3c-b02c-f6d55cc9b1c8"]
---
time 1764681755
new [description:"Review and edit Goals and Outcomes section" due:"1764910800" entry:"1764681755" modified:"1764681755" project:"ERLM" status:"pending" tags:"editing" tags_editing:"x" uuid:"0888fdb8-f5cd-4374-a589-b7b3c1bbd472"]
---
time 1764681755
new [description:"Review and edit State of the Art section" due:"1764910800" entry:"1764681755" modified:"1764681755" project:"ERLM" status:"pending" tags:"editing" tags_editing:"x" uuid:"0d921ea2-6211-4cd8-bbc4-4f9bf36794d3"]
---
time 1764681755
new [description:"Review and edit Research Approach section" due:"1764910800" entry:"1764681755" modified:"1764681755" project:"ERLM" status:"pending" tags:"editing" tags_editing:"x" uuid:"9ce7d23c-0f56-49af-b97d-a684966cfbae"]
---
time 1764681755
new [description:"Review and edit Metrics of Success section" due:"1764910800" entry:"1764681755" modified:"1764681755" project:"ERLM" status:"pending" tags:"editing" tags_editing:"x" uuid:"29cc8c63-1fb7-4523-9953-603467b929ee"]
---
time 1764681755
new [description:"Review and edit Risks and Contingencies section" due:"1764910800" entry:"1764681755" modified:"1764681755" project:"ERLM" status:"pending" tags:"editing" tags_editing:"x" uuid:"e354ab0c-cef7-41e2-bfb4-d98886e512b7"]
---
time 1764681756
new [description:"Review and edit Broader Impacts section" due:"1764910800" entry:"1764681756" modified:"1764681756" project:"ERLM" status:"pending" tags:"editing" tags_editing:"x" uuid:"d1fa2409-2f2f-4855-81be-14ee617df5d2"]
---
time 1764681756
new [description:"Review and edit Budget section" due:"1764910800" entry:"1764681756" modified:"1764681756" project:"ERLM" status:"pending" tags:"editing" tags_editing:"x" uuid:"689420d6-7191-42b6-b691-94ad39c8e0dd"]
---
time 1764681756
new [description:"Review and edit Schedule section" due:"1764910800" entry:"1764681756" modified:"1764681756" project:"ERLM" status:"pending" tags:"editing" tags_editing:"x" uuid:"14fee599-fe0f-4773-90fc-c5f78291f425"]
---
time 1764681766
new [description:"Verify RFP compliance for all sections" due:"1764910800" entry:"1764681766" modified:"1764681766" project:"ERLM" status:"pending" tags:"editing" tags_editing:"x" uuid:"a4c027fa-f50d-4efc-ab61-5b8054810a80"]
---
time 1764681766
new [description:"Final proofread and polish entire proposal" due:"1764910800" entry:"1764681766" modified:"1764681766" project:"ERLM" status:"pending" tags:"editing" tags_editing:"x" uuid:"5ba3929b-5ec3-4c9d-b30e-30fd8fe20b54"]
---
time 1764681766
new [description:"Compile and generate final PDF" due:"1764910800" entry:"1764681766" modified:"1764681766" project:"ERLM" status:"pending" uuid:"2a8e9294-aecc-434a-b5dd-a468baf8f4a8"]
---
time 1764681809
old [description:"ERLM proposal due" due:"1764997200" entry:"1764681347" modified:"1764681416" project:"ERLM" status:"pending" tags:"writing" tags_writing:"x" uuid:"f6968367-96f1-4ce2-8691-e45423e27456"]
new [dep_0888fdb8-f5cd-4374-a589-b7b3c1bbd472:"x" dep_0d921ea2-6211-4cd8-bbc4-4f9bf36794d3:"x" dep_14fee599-fe0f-4773-90fc-c5f78291f425:"x" dep_29cc8c63-1fb7-4523-9953-603467b929ee:"x" dep_2a8e9294-aecc-434a-b5dd-a468baf8f4a8:"x" dep_5ba3929b-5ec3-4c9d-b30e-30fd8fe20b54:"x" dep_689420d6-7191-42b6-b691-94ad39c8e0dd:"x" dep_9ce7d23c-0f56-49af-b97d-a684966cfbae:"x" dep_a4c027fa-f50d-4efc-ab61-5b8054810a80:"x" dep_d1fa2409-2f2f-4855-81be-14ee617df5d2:"x" dep_e354ab0c-cef7-41e2-bfb4-d98886e512b7:"x" depends:"0888fdb8-f5cd-4374-a589-b7b3c1bbd472,0d921ea2-6211-4cd8-bbc4-4f9bf36794d3,14fee599-fe0f-4773-90fc-c5f78291f425,29cc8c63-1fb7-4523-9953-603467b929ee,2a8e9294-aecc-434a-b5dd-a468baf8f4a8,5ba3929b-5ec3-4c9d-b30e-30fd8fe20b54,689420d6-7191-42b6-b691-94ad39c8e0dd,9ce7d23c-0f56-49af-b97d-a684966cfbae,a4c027fa-f50d-4efc-ab61-5b8054810a80,d1fa2409-2f2f-4855-81be-14ee617df5d2,e354ab0c-cef7-41e2-bfb4-d98886e512b7" description:"ERLM proposal due" due:"1764997200" entry:"1764681347" modified:"1764681809" project:"ERLM" status:"pending" tags:"writing" tags_writing:"x" uuid:"f6968367-96f1-4ce2-8691-e45423e27456"]
---

File diff suppressed because it is too large Load Diff

View File

@ -0,0 +1,421 @@
# ERLM Proposal Writing Review - Executive Summary
**Date**: December 2, 2025
**Reviewer**: Claude Code
**Framework**: Gopen's Sense of Structure
---
## Overview
This proposal demonstrates strong technical content, clear methodology, and comprehensive coverage of all required elements. The research approach is well-conceived, and the progression from problem statement through solution is logical. The writing is generally clear and professional.
**Key Strengths:**
- Excellent technical depth and specificity
- Strong motivation established through human factors statistics
- Clear three-thrust research structure
- Comprehensive risk analysis with concrete contingencies
- Good use of specific examples (TMI accident, HARDENS project)
**Priority Areas for Revision:**
- Sentence-level: Strengthen stress positions to emphasize key claims
- Paragraph-level: Sharpen point-issue structure in some sections
- Section-level: Tighten organization in State of the Art section
- Big picture: Strengthen "so what" connections throughout
---
## Priority Issues (Top 10)
### 1. **SOTA Section Length and Organization** [SECTION-LEVEL]
**Location**: State of the Art section (358 lines)
**Issue**: The SOTA section is the longest in the proposal and covers multiple distinct topics (current procedures, human factors, HARDENS). While comprehensive, it risks overwhelming readers and obscuring your key
contributions.
**Impact**: HIGH - Reviewers may lose track of your argument in the density
**Recommendation**: Consider restructuring with clearer signposting. Each subsection should explicitly connect back to what gap you're filling. The current "\textbf{LIMITATION:}" callouts are excellent—ensure every major subsection has one.
### 2. **Weak Stress Positions Throughout** [SENTENCE-LEVEL]
**Location**: All sections, especially Goals and State of the Art
**Issue**: Many sentences place old/known information in stress position (sentence-final), missing opportunities to emphasize new claims
**Impact**: MEDIUM-HIGH - Reduces rhetorical impact of key claims
**See Pattern**: "Stress Position Weakness" below for examples and fixes
### 3. **Missing "So What" Connections** [BIG PICTURE]
**Location**: Transitions between major sections
**Issue**: The proposal moves from problem → approach → metrics without always explicitly stating "this matters because..." at transition points
**Impact**: MEDIUM-HIGH - Reviewers may not fully grasp significance
**Recommendation**: Add explicit "if successful, this enables..." statements at the end of Goals section and beginning of Metrics section
### 4. **Passive Voice Obscuring Agency** [SENTENCE-LEVEL]
**Location**: Research Approach, especially subsection introductions
**Issue**: Passive constructions like "will be employed" and "will be used" hide who does what and reduce directness
**Impact**: MEDIUM - Reduces clarity and makes writing feel less confident
**See Pattern**: "Passive Voice" below
### 5. **Point-Issue Structure in Paragraphs** [PARAGRAPH-LEVEL]
**Location**: State of the Art, Risk sections
**Issue**: Some paragraphs present information without first establishing why readers should care (the "issue")
**Impact**: MEDIUM - Readers may wonder "why are you telling me this?"
**See Pattern**: "Point-Issue Structure" below
### 6. **Topic String Breaks** [PARAGRAPH-LEVEL]
**Location**: Research Approach, subsection transitions
**Issue**: Topic position doesn't always establish clear continuity from previous sentence, forcing readers to reconstruct connections
**Impact**: MEDIUM - Increases cognitive load
**See Pattern**: "Topic Position & Continuity" below
### 7. **Nominalization Hiding Action** [SENTENCE-LEVEL]
**Location**: Throughout, especially Research Approach
**Issue**: Action buried in nouns (e.g., "implementation" instead of "implement", "verification" instead of "verify")
**Impact**: MEDIUM - Makes writing feel static rather than dynamic
**Recommendation**: Convert nominalizations to active verbs where possible
### 8. **Long Complex Sentences** [SENTENCE-LEVEL]
**Location**: State of the Art (lines 45-51), Risks (lines 72-79)
**Issue**: Some sentences exceed 40-50 words with multiple subordinate clauses, challenging comprehension
**Impact**: MEDIUM - Reviewers may have to re-read
**Recommendation**: Break into 2-3 shorter sentences with clear logical flow
### 9. **Subsection Balance in Risks Section** [SECTION-LEVEL]
**Location**: Risks and Contingencies section
**Issue**: Four subsections of vastly different lengths (computational tractability gets more space than discrete-continuous interface, despite latter being more fundamental)
**Impact**: LOW-MEDIUM - May suggest misaligned priorities
**Recommendation**: Consider whether space allocation reflects actual risk magnitude
### 10. **Broader Impacts Underutilized** [BIG PICTURE]
**Location**: Broader Impacts section (75 lines vs 358 for SOTA)
**Issue**: This section is relatively brief given that economic impact is a major motivation for SMRs
**Impact**: LOW-MEDIUM - Missing opportunity to strengthen value proposition
**Recommendation**: Consider expanding economic analysis or adding brief discussion of workforce/educational impacts
---
## Key Patterns Identified
### Pattern 1: Stress Position Weakness
**Principle** (Gopen): The stress position (end of sentence) should contain the most important new information. Readers expect climax at sentence-end and are disappointed when they find old information or weak phrases there.
**Example 1** (Goals and Outcomes, lines 13-17):
```
Current: "Currently, nuclear plant operations rely on extensively trained
human operators who follow detailed written procedures and strict regulatory
requirements to manage reactor control."
```
- **Issue**: Sentence ends with "manage reactor control"—a restatement of the opening. The key claim is buried mid-sentence: "extensively trained...detailed procedures...strict requirements"
- **Fixed**: "Currently, nuclear plant operations require extensively trained human operators following detailed written procedures under strict regulatory requirements."
**Example 2** (State of the Art, lines 53-54):
```
Current: "Procedures lack formal verification of correctness and completeness."
```
- **Issue**: Ends weakly with "completeness" which is minor compared to the bigger issue
- **Fixed**: "Procedures lack formal verification, leaving correctness and completeness unproven."
**Example 3** (Research Approach, lines 41-42):
```
Current: "The following sections discuss how these thrusts will be accomplished."
```
- **Issue**: Pure metadiscourse in stress position, provides no new information
- **Fixed**: Delete this sentence—the enumeration provides sufficient transition, or combine with previous sentence: "...through three main thrusts, each detailed below."
**Similar instances**:
- Goals lines 29-32: "...we will combine formal methods..."
- State of the Art lines 81-85: "...no application of hybrid control theory exists..."
- Research Approach lines 115-116: "...enable progression to the next step..."
- Metrics lines 29-31: "...makes this metric directly relevant..."
- Risks lines 12-13: "...identification of remaining barriers to deployment"
**How to fix**: Identify the most important new claim in each sentence and move it to the end. Often this means converting from "X does Y to achieve Z" to "X achieves Z by doing Y."
---
### Pattern 2: Passive Voice Obscuring Agency
**Principle** (Gopen): Passive voice obscures who does what and reduces directness. In proposal writing, active voice demonstrates confidence and control. Use passive only when the agent is truly unimportant or unknown.
**Example 1** (Research Approach, line 118):
```
Current: "We will employ state-of-the-art reactive synthesis tools..."
```
- **Issue**: "Employ" is weak; you're not hiring the tools, you're using them
- **Better**: "We will use Strix, a state-of-the-art reactive synthesis tool..."
- **Best**: "Strix will translate our temporal logic specifications into deterministic automata..."
(Shows what the tool *does*, not just that you'll use it)
**Example 2** (Research Approach, line 207):
```
Current: "Control barrier functions will be employed when..."
```
- **Issue**: Passive—who employs them? And "employed" sounds formal/stuffy
- **Fixed**: "We will use control barrier functions to verify..." or better "Control barrier functions verify..."
**Example 3** (Metrics, line 67):
```
Current: "This milestone delivers an internal technical report..."
```
- **Issue**: Milestones don't deliver, people do
- **Fixed**: "We will deliver an internal technical report documenting..."
**Similar instances**:
- Research Approach lines 161, 175, 206, 220: "will be employed", "will be developed", "will be used"
- Metrics lines 69, 73, 79, 84: "...delivers a [document]"
- Risks lines 57, 109, 163: various passives
**How to fix**:
1. Identify the real agent (usually "we")
2. Make agent the subject: "We will X" or "X will Y"
3. Choose strong active verbs: use/apply/develop/verify (not employ/utilize)
---
### Pattern 3: Point-Issue Structure Weakness
**Principle** (Gopen): Paragraphs should begin by establishing (1) the point/claim being made and (2) why it matters (the issue). Discussion then supports that point. Readers need context before details.
**Example 1** (State of the Art, lines 88-107):
```
Current paragraph begins: "The persistent role of human error in nuclear
safety incidents, despite decades of improvements..."
```
- **Analysis**: This paragraph immediately dives into the "persistent role" without first establishing why we're discussing human factors at all. Reader thinks: "Wait, weren't we just talking about procedures?"
- **Fixed**: Add issue statement first: "Human factors provide the most compelling motivation for formal automated control. Despite decades of improvements in training and procedures, human error persists in 70-80% of nuclear incidents—suggesting that operator-based control faces fundamental, not remediable, limitations."
**Example 2** (Risks, first paragraph):
```
Current: "This research relies on several critical assumptions that, if
invalidated, would require scope adjustment..."
```
- **Analysis**: Good—this establishes both point (critical assumptions exist) and issue (invalidity requires adjustment) immediately. The paragraph then delivers on this promise. This is a good model!
**Example 3** (Research Approach, lines 166-169):
```
Current: "While discrete system components will be synthesized with correctness
guarantees, they represent only half of the complete system."
```
- **Analysis**: Good issue statement (discrete alone insufficient), but could be sharper about the point. What will this section show?
- **Fixed**: "While discrete system components will be synthesized with correctness guarantees, they represent only half of the complete system. This section describes how we will develop continuous control modes, verify their correctness, and address the unique verification challenges at the discrete-continuous interface."
**Similar instances**:
- State of the Art lines 13-34: long paragraph with delayed point
- Goals lines 103-119: impact paragraph could be tighter
- Approach lines 178-208: three-mode classification needs clearer framing
**How to fix**:
1. First sentence should state the paragraph's point
2. Second sentence (or same sentence) should state why this matters
3. Remaining sentences provide supporting detail
---
### Pattern 4: Topic Position & Continuity
**Principle** (Gopen): The topic position (beginning of sentence) should contain old/familiar information that links to what came before. This creates flow and coherence. Abrupt topic shifts disorient readers.
**Example 1** (Goals, lines 18-23):
```
Sentence 1: "...this reliance on human operators prevents the introduction
of autonomous control capabilities..."
Sentence 2: "Emerging technologies like small modular reactors face
significantly higher per-megawatt staffing costs..."
```
- **Issue**: Topic shifts abruptly from "reliance on operators" to "emerging technologies". Connection exists (both about staffing challenges) but isn't explicit
- **Fixed**: "...prevents autonomous control capabilities. This limitation creates particular challenges for emerging technologies like small modular reactors, which face significantly higher per-megawatt staffing costs..."
**Example 2** (State of the Art, lines 234-243):
```
Sentence about what HARDENS addressed: "...discrete digital control logic..."
Next sentence: "However, the project did not address continuous dynamics..."
```
- **Analysis**: Good use of "however, the project" in topic position—maintains focus on HARDENS while pivoting to limitation. This is a good model!
**Example 3** (Research Approach, lines 56-58):
```
Sentence 1: "...we may be able to translate them into logical formulae..."
Sentence 2: "Linear Temporal Logic (LTL) provides four fundamental operators..."
```
- **Issue**: Abrupt topic shift from "translating procedures" to "LTL provides". Missing: why LTL? Why now?
- **Fixed**: "...translate them into logical formulae. To formalize these procedures, we will use Linear Temporal Logic (LTL), which provides four fundamental operators..."
**Similar instances**:
- Goals lines 23-27: "emerging technologies" → "what is needed"
- State of the Art lines 72-74: control modes → division between automated/human
- Approach lines 183-185: stabilizing mode example → transitory mode definition
**How to fix**:
1. Identify the topic of the previous sentence
2. Begin next sentence with something related to that topic
3. Use transitional phrases when shifting topics: "This [previous thing] leads to [new thing]"
---
### Pattern 5: Long Complex Sentences
**Principle**: Sentences with multiple subordinate clauses (especially over 35-40 words) tax reader working memory. Breaking into multiple sentences often improves clarity without losing sophistication.
**Example 1** (State of the Art, lines 48-51):
```
Current (51 words): "Procedures undergo technical evaluation, simulator
validation testing, and biennial review as part of operator requalification
under 10 CFR 55.59, but despite these rigorous development processes,
procedures fundamentally lack formal verification of key safety properties."
```
- **Issue**: Long sentence with list, subordinate clause, and contrast—hard to parse
- **Fixed (2 sentences)**: "Procedures undergo technical evaluation, simulator validation testing, and biennial review as part of operator requalification under 10 CFR 55.59. Despite these rigorous development processes, procedures fundamentally lack formal verification of key safety properties."
**Example 2** (Risks, lines 72-78):
```
Current (57 words): "Temporal logic operates on boolean predicates, while
continuous control requires reasoning about differential equations and
reachable sets, and guard conditions that require complex nonlinear predicates
may resist boolean abstraction, making synthesis intractable."
```
- **Issue**: Run-on with multiple clauses strung together with commas
- **Fixed (3 sentences)**: "Temporal logic operates on boolean predicates, while continuous control requires reasoning about differential equations and reachable sets. Guard conditions requiring complex nonlinear predicates may resist boolean abstraction. This mismatch could make synthesis intractable."
**Similar instances**:
- State of the Art lines 44-51: procedure development description
- Research Approach lines 40-45: hybrid system description
- Risks lines 17-24: computational tractability discussion
- Broader Impacts lines 13-23: economic analysis
**How to fix**:
1. Identify natural breakpoints (usually where you have "and" or "but")
2. Create new sentences at these breaks
3. Ensure each new sentence has clear topic position
4. May need to repeat/reference previous sentence's subject for clarity
---
## Section-Level Issues
### Goals and Outcomes Section
**Strengths**: Excellent structure with clear goal → problem → approach → outcomes → impact progression. The four-paragraph opening is very strong.
**Issues**:
- Lines 29-53 (Approach paragraph): This is dense and tries to cover too much. Consider breaking into two paragraphs: one on the approach concept, one on the hypothesis and rationale.
- Outcomes enumeration: Very clear, but could strengthen the transition from strategy to outcome in each item. Currently reads as "we'll do X. [new sentence] This enables Y." Consider: "We'll do X, enabling Y."
### State of the Art Section
**Strengths**: Comprehensive, well-researched, excellent use of the HARDENS case study as both positive example and gap identifier.
**Issues**:
- **Length**: At 358 lines, this risks losing readers. Most concerning: readers may forget your framing by the time they reach your contribution.
- **Organization**: Four major subsections (procedures, human factors, HARDENS, research imperative) would benefit from a roadmap sentence at the beginning: "To understand the need for hybrid control synthesis, we first examine..."
- **Balance**: HARDENS subsection is 89 lines—nearly 25% of SOTA. While impressive, consider whether this should be a separate section or whether some detail could move to an appendix.
- **Transition to Approach**: The "Research Imperative" subsection is excellent but feels like it belongs at the start of Research Approach rather than end of SOTA.
### Research Approach Section
**Strengths**: Clear three-thrust structure, good use of equations and examples, strong technical detail.
**Issues**:
- **Subsection transitions**: The transitions between the three main subsections (Procedures→Temporal, Temporal→Discrete, Discrete→Continuous) could be smoother. Each starts somewhat abruptly.
- **SmAHTR introduction**: The SmAHTR demonstration case is introduced suddenly at line 253. Consider introducing it earlier (perhaps in Goals section or at start of Approach) so readers know it's coming.
- **Three-mode classification**: Lines 178-208 present the stabilizing/transitory/expulsory framework, which is innovative. This deserves more prominence—consider highlighting it as a key contribution.
### Metrics of Success Section
**Strengths**: TRL framework is well-justified, progression through levels is clear.
**Issues**:
- **Defensive tone**: Lines 11-30 spend considerable space justifying why TRL is appropriate. This is good but could be more concise. Consider: one paragraph on why TRLs (lines 10-19) rather than two.
- **Grading criteria**: The TRL definitions (3, 4, 5) are excellent. Very concrete and measurable.
### Risks and Contingencies Section
**Strengths**: Comprehensive, each risk has indicators and contingencies, well-organized.
**Issues**:
- **Subsection balance**: Four subsections range from 41 lines (computational) to 65 lines (discrete-continuous). Ensure space reflects actual risk level.
- **Mitigation vs. contingency**: Some subsections blur "mitigation" (preventing problems) and "contingency" (response if they occur). Consider clarifying this structure.
### Broader Impacts Section
**Strengths**: Clear economic motivation, good connection to SMRs and datacenter application.
**Issues**:
- **Brevity**: At 75 lines, this is the shortest technical section. Given that economic viability is a key motivation, consider expanding.
- **Missed opportunities**: Could briefly mention workforce/educational impacts (training future engineers in formal methods), equity (providing reliable clean energy to underserved areas), broader applicability beyond nuclear.
### Budget Section
**Brief review**: Budget is comprehensive, well-justified, appropriate. Minor note: Consider whether the high-performance workstation (Year 1) might need upgrades in Year 2-3 as synthesis scales up.
### Schedule Section
**Brief review**: Schedule is ambitious but realistic. Six trimesters for dissertation research is reasonable. Publication strategy is smart (nuclear community first, then broader control theory community). Minor note: Line 73 has a space issue ("t ranslation").
---
## Big Picture Observations
### Narrative and Argument Structure
**Strengths**:
- Clear problem-solution arc: operators make errors → procedures lack formal guarantees → hybrid control synthesis provides guarantees
- Good use of motivating examples (TMI, human error statistics, HARDENS)
- Technical progression is logical: discrete synthesis → continuous verification → integrated system
**Opportunities**:
1. **Strengthen "so what" transitions**: The proposal sometimes presents information without explicitly stating significance. Add more "This matters because..." statements.
2. **Emphasize novelty earlier**: The three-mode classification and discrete-continuous interface verification are novel contributions. Signal this earlier and more explicitly.
3. **Create more callbacks**: When describing Research Approach, refer back to specific limitations identified in State of the Art. Currently these connections are implicit.
### Rhetorical Effectiveness
**Credibility established through**:
- Comprehensive literature review
- Specific technical detail
- Access to industry hardware (Emerson partnership)
- Prior conference recognition (best student paper)
**Value proposition**:
- Clear economic impact (O&M cost reduction)
- Safety improvement (mathematical guarantees vs. human operators)
- Broader applicability (methodology generalizes)
**Could strengthen**:
- More explicit statements of what's novel vs. what's established practice
- Stronger emphasis on the unique combination of discrete synthesis + continuous verification (others do one or the other, not both)
### Content Gaps and Consistency
**Terminology**:
- Generally consistent
- Good introduction of technical terms (hybrid automata, temporal logic, reachability analysis)
- Minor: "correct by construction" vs. "provably correct"—used interchangeably, which is fine, but could note they're synonymous
**Scope consistency**:
- Excellent—stays focused on startup procedures for SmAHTR
- Appropriately acknowledges limitations (TRL 5, not deployment-ready)
- Risk section addresses what happens if scope must narrow
**Potential gaps**:
1. **Cybersecurity**: Not mentioned. For autonomous nuclear control, shouldn't there be at least a paragraph on security verification?
2. **Regulatory path**: You mention "regulatory requirements" but don't detail what NRC approval process would look like. Even a paragraph would strengthen credibility.
3. **Comparison with alternatives**: What about machine learning approaches to autonomous control? Worth a paragraph explaining why formal methods are superior for safety-critical systems.
---
## Gopen Framework Quick Reference
**Stress Position**: End of sentence should contain most important new information. Readers expect climax there.
**Topic Position**: Beginning of sentence should contain familiar information that links to previous sentence. Creates flow.
**Point-Issue Structure**: Paragraphs should open by stating (1) the point/claim and (2) why it matters, before providing supporting detail.
**Topic String**: The chain of topics across sentences in a paragraph. Strong topic strings create coherence; broken ones confuse readers.
**Old→New Information Flow**: Information should flow from familiar (old) to unfamiliar (new) within sentences and paragraphs.
---
## Next Steps
1. **Start with Priority Issues 1-3**: These have the highest impact
2. **Apply Patterns**: Use the pattern examples to fix similar instances throughout
3. **Consult Detailed Document**: For comprehensive checkbox-by-checkbox revisions
4. **Section-by-section revision**: Work through one section at a time, applying patterns
5. **Final pass for consistency**: Ensure changes maintain consistent terminology and tone
This proposal has strong technical content and a solid structure. The revisions suggested here will strengthen clarity, emphasize key contributions, and make the argument even more compelling for reviewers. Good luck with your revisions!

Binary file not shown.

View File

@ -0,0 +1,40 @@
\relax
\providecommand\hyper@newdestlabel[2]{}
\providecommand\HyField@AuxAddToFields[1]{}
\providecommand\HyField@AuxAddToCoFields[2]{}
\@writefile{nav}{\headcommand {\slideentry {0}{0}{1}{1/1}{}{0}}}
\@writefile{nav}{\headcommand {\beamer@framepages {1}{1}}}
\@writefile{nav}{\headcommand {\slideentry {0}{0}{2}{2/4}{}{0}}}
\@writefile{nav}{\headcommand {\beamer@framepages {2}{4}}}
\@writefile{nav}{\headcommand {\slideentry {0}{0}{3}{5/9}{}{0}}}
\@writefile{nav}{\headcommand {\beamer@framepages {5}{9}}}
\@writefile{nav}{\headcommand {\slideentry {0}{0}{4}{10/10}{}{0}}}
\@writefile{nav}{\headcommand {\beamer@framepages {10}{10}}}
\@writefile{nav}{\headcommand {\slideentry {0}{0}{5}{11/13}{}{0}}}
\@writefile{nav}{\headcommand {\beamer@framepages {11}{13}}}
\@writefile{nav}{\headcommand {\slideentry {0}{0}{6}{14/17}{}{0}}}
\@writefile{nav}{\headcommand {\beamer@framepages {14}{17}}}
\@writefile{nav}{\headcommand {\slideentry {0}{0}{7}{18/20}{}{0}}}
\@writefile{nav}{\headcommand {\beamer@framepages {18}{20}}}
\@writefile{nav}{\headcommand {\slideentry {0}{0}{8}{21/21}{}{0}}}
\@writefile{nav}{\headcommand {\beamer@framepages {21}{21}}}
\@writefile{nav}{\headcommand {\slideentry {0}{0}{9}{22/25}{}{0}}}
\@writefile{nav}{\headcommand {\beamer@framepages {22}{25}}}
\@writefile{nav}{\headcommand {\slideentry {0}{0}{10}{26/29}{}{0}}}
\@writefile{nav}{\headcommand {\beamer@framepages {26}{29}}}
\@writefile{nav}{\headcommand {\slideentry {0}{0}{11}{30/32}{}{0}}}
\@writefile{nav}{\headcommand {\beamer@framepages {30}{32}}}
\@writefile{nav}{\headcommand {\slideentry {0}{0}{12}{33/36}{}{0}}}
\@writefile{nav}{\headcommand {\beamer@framepages {33}{36}}}
\@writefile{nav}{\headcommand {\slideentry {0}{0}{13}{37/39}{}{0}}}
\@writefile{nav}{\headcommand {\beamer@framepages {37}{39}}}
\@writefile{nav}{\headcommand {\slideentry {0}{0}{14}{40/40}{}{0}}}
\@writefile{nav}{\headcommand {\beamer@framepages {40}{40}}}
\@writefile{nav}{\headcommand {\slideentry {0}{0}{15}{41/41}{}{0}}}
\@writefile{nav}{\headcommand {\beamer@framepages {41}{41}}}
\@writefile{nav}{\headcommand {\beamer@partpages {1}{41}}}
\@writefile{nav}{\headcommand {\beamer@subsectionpages {1}{41}}}
\@writefile{nav}{\headcommand {\beamer@sectionpages {1}{41}}}
\@writefile{nav}{\headcommand {\beamer@documentpages {41}}}
\@writefile{nav}{\headcommand {\gdef \inserttotalframenumber {15}}}
\gdef \@abspage@last{41}

View File

@ -1,5 +1,5 @@
# Fdb version 4 # Fdb version 4
["lualatex"] 1764528713.881 "main.tex" "main.pdf" "main" 1764528717.95623 0 ["lualatex"] 1764563081.01433 "main.tex" "main.pdf" "main" 1764563115.66898 0
"/usr/share/texlive/texmf-dist/fonts/tfm/public/amsfonts/cmextra/cmex7.tfm" 1246382020 1004 54797486969f23fa377b128694d548df "" "/usr/share/texlive/texmf-dist/fonts/tfm/public/amsfonts/cmextra/cmex7.tfm" 1246382020 1004 54797486969f23fa377b128694d548df ""
"/usr/share/texlive/texmf-dist/fonts/tfm/public/amsfonts/cmextra/cmex8.tfm" 1246382020 988 bdf658c3bfc2d96d3c8b02cfc1c94c20 "" "/usr/share/texlive/texmf-dist/fonts/tfm/public/amsfonts/cmextra/cmex8.tfm" 1246382020 988 bdf658c3bfc2d96d3c8b02cfc1c94c20 ""
"/usr/share/texlive/texmf-dist/fonts/tfm/public/amsfonts/symbols/msam10.tfm" 1246382020 916 f87d7c45f9c908e672703b83b72241a3 "" "/usr/share/texlive/texmf-dist/fonts/tfm/public/amsfonts/symbols/msam10.tfm" 1246382020 916 f87d7c45f9c908e672703b83b72241a3 ""
@ -253,9 +253,6 @@
"/usr/share/texlive/texmf-dist/tex/latex/hyperref/nameref.sty" 1705871765 11026 182c63f139a71afd30a28e5f1ed2cd1c "" "/usr/share/texlive/texmf-dist/tex/latex/hyperref/nameref.sty" 1705871765 11026 182c63f139a71afd30a28e5f1ed2cd1c ""
"/usr/share/texlive/texmf-dist/tex/latex/hyperref/pd1enc.def" 1705871765 14249 e67cb186717b7ab18d14a4875e7e98b5 "" "/usr/share/texlive/texmf-dist/tex/latex/hyperref/pd1enc.def" 1705871765 14249 e67cb186717b7ab18d14a4875e7e98b5 ""
"/usr/share/texlive/texmf-dist/tex/latex/hyperref/puenc.def" 1705871765 117112 05831178ece2cad4d9629dcf65099b11 "" "/usr/share/texlive/texmf-dist/tex/latex/hyperref/puenc.def" 1705871765 117112 05831178ece2cad4d9629dcf65099b11 ""
"/usr/share/texlive/texmf-dist/tex/latex/koma-script/scrlfile-hook.sty" 1688762466 11185 15c86b5a61db19da88ab941ca5b70a12 ""
"/usr/share/texlive/texmf-dist/tex/latex/koma-script/scrlfile.sty" 1688762466 3328 3d5fc41a419bf18130ce17d90a23c295 ""
"/usr/share/texlive/texmf-dist/tex/latex/koma-script/scrlogo.sty" 1688762466 2162 418e29bcf2b8059e8a9ee1ea4d0d0c87 ""
"/usr/share/texlive/texmf-dist/tex/latex/kvoptions/kvoptions.sty" 1655478651 22555 6d8e155cfef6d82c3d5c742fea7c992e "" "/usr/share/texlive/texmf-dist/tex/latex/kvoptions/kvoptions.sty" 1655478651 22555 6d8e155cfef6d82c3d5c742fea7c992e ""
"/usr/share/texlive/texmf-dist/tex/latex/kvsetkeys/kvsetkeys.sty" 1665067230 13815 760b0c02f691ea230f5359c4e1de23a7 "" "/usr/share/texlive/texmf-dist/tex/latex/kvsetkeys/kvsetkeys.sty" 1665067230 13815 760b0c02f691ea230f5359c4e1de23a7 ""
"/usr/share/texlive/texmf-dist/tex/latex/l3backend/l3backend-luatex.def" 1704491087 30427 8d3aa1c568fd04ad1943491c682f4fbe "" "/usr/share/texlive/texmf-dist/tex/latex/l3backend/l3backend-luatex.def" 1704491087 30427 8d3aa1c568fd04ad1943491c682f4fbe ""
@ -276,7 +273,6 @@
"/usr/share/texlive/texmf-dist/tex/latex/pgfplots/pgfplots.sty" 1496704190 4904 ee78b44e85d6fccf08cd99370557481e "" "/usr/share/texlive/texmf-dist/tex/latex/pgfplots/pgfplots.sty" 1496704190 4904 ee78b44e85d6fccf08cd99370557481e ""
"/usr/share/texlive/texmf-dist/tex/latex/refcount/refcount.sty" 1576624809 9878 9e94e8fa600d95f9c7731bb21dfb67a4 "" "/usr/share/texlive/texmf-dist/tex/latex/refcount/refcount.sty" 1576624809 9878 9e94e8fa600d95f9c7731bb21dfb67a4 ""
"/usr/share/texlive/texmf-dist/tex/latex/rerunfilecheck/rerunfilecheck.sty" 1657483315 9714 ba3194bd52c8499b3f1e3eb91d409670 "" "/usr/share/texlive/texmf-dist/tex/latex/rerunfilecheck/rerunfilecheck.sty" 1657483315 9714 ba3194bd52c8499b3f1e3eb91d409670 ""
"/usr/share/texlive/texmf-dist/tex/latex/sansmathaccent/sansmathaccent.sty" 1580595219 4282 5d27280ace1239baaa4a225df16125ff ""
"/usr/share/texlive/texmf-dist/tex/latex/tex-ini-files/lualatexquotejobname.lua" 1700513690 1021 ae37ae5e20605f170274bb33ea1a0e3d "" "/usr/share/texlive/texmf-dist/tex/latex/tex-ini-files/lualatexquotejobname.lua" 1700513690 1021 ae37ae5e20605f170274bb33ea1a0e3d ""
"/usr/share/texlive/texmf-dist/tex/latex/tools/array.sty" 1698869629 12667 e4b5eb11e4b7239e6c8a52bbe074a6c6 "" "/usr/share/texlive/texmf-dist/tex/latex/tools/array.sty" 1698869629 12667 e4b5eb11e4b7239e6c8a52bbe074a6c6 ""
"/usr/share/texlive/texmf-dist/tex/latex/tools/enumerate.sty" 1698869629 3468 0ef513f22d965f96b06adb5cff671cd7 "" "/usr/share/texlive/texmf-dist/tex/latex/tools/enumerate.sty" 1698869629 3468 0ef513f22d965f96b06adb5cff671cd7 ""
@ -312,44 +308,44 @@
"/usr/share/texmf/tex/latex/lm/ot1lmss.fd" 1616454256 1657 338c306198616f83902603448cf66d97 "" "/usr/share/texmf/tex/latex/lm/ot1lmss.fd" 1616454256 1657 338c306198616f83902603448cf66d97 ""
"/usr/share/texmf/tex/latex/lm/t1lmss.fd" 1616454256 1641 f48673bce41ac279099d0c9523459753 "" "/usr/share/texmf/tex/latex/lm/t1lmss.fd" 1616454256 1641 f48673bce41ac279099d0c9523459753 ""
"/usr/share/texmf/tex/latex/lm/t1lmtt.fd" 1616454256 2682 555da1faa2e266801e4b221d01a42cb5 "" "/usr/share/texmf/tex/latex/lm/t1lmtt.fd" 1616454256 2682 555da1faa2e266801e4b221d01a42cb5 ""
"/var/lib/texmf/fonts/map/pdftex/updmap/pdftex.map" 1760105440.02229 5312232 f3296911be9cc021788f3f879cf0a47d "" "/var/lib/texmf/fonts/map/pdftex/updmap/pdftex.map" 1722610820.43889 128028 f533b797fba58d231669ea19e894e23e ""
"/var/lib/texmf/web2c/luahbtex/lualatex.fmt" 1726065905 12230446 10024404f08a230959a13fd14332f6f6 "" "/var/lib/texmf/web2c/luahbtex/lualatex.fmt" 1726005827 12241850 afe77aad1222fbf42eeb2a1860f5d5eb ""
"bouncing_ball_hybrid.png" 1764470868.42471 503848 9d63c93b20beb6e8494b16d4a08cb98f "" "bouncing_ball_hybrid.png" 1764562988.41076 503848 9d63c93b20beb6e8494b16d4a08cb98f ""
"images/1_hook/energy-demand-graph-small.png" 1763336452.14299 498793 d4b20a2a70c23e430cd42f1a958494ac "" "images/1_hook/energy-demand-graph-small.png" 1764562988.41376 498793 d4b20a2a70c23e430cd42f1a958494ac ""
"images/1_hook/nuclear-plant.png" 1764360699.85273 33643 ae391bd2b827c05be2b7a877fcdaf999 "" "images/1_hook/nuclear-plant.png" 1764562988.41376 33643 ae391bd2b827c05be2b7a877fcdaf999 ""
"images/2_state_of_the_art/control_room.jpg" 1764382088.57397 436102 0cd66f6d4671f09be64a9540a575a28d "" "images/2_state_of_the_art/control_room.jpg" 1764562988.41476 436102 0cd66f6d4671f09be64a9540a575a28d ""
"images/2_state_of_the_art/foreman.png" 1764364968.83299 26755 f399e83f67628674d2f3d5d3760d5641 "" "images/2_state_of_the_art/foreman.png" 1764562988.41476 26755 f399e83f67628674d2f3d5d3760d5641 ""
"images/2_state_of_the_art/nuclear-plant.png" 1764364968.83167 33643 ae391bd2b827c05be2b7a877fcdaf999 "" "images/2_state_of_the_art/nuclear-plant.png" 1764562988.41576 33643 ae391bd2b827c05be2b7a877fcdaf999 ""
"images/2_state_of_the_art/worker.png" 1764364968.83413 27672 7065ad1534208191d96629b550f62ee6 "" "images/2_state_of_the_art/worker.png" 1764562988.41576 27672 7065ad1534208191d96629b550f62ee6 ""
"images/3_limitations/computer.png" 1764446428.78424 34281 45b36816bb88d3aea9b85ab2930e4bf4 "" "images/3_limitations/computer.png" 1764562988.41576 34281 45b36816bb88d3aea9b85ab2930e4bf4 ""
"images/3_limitations/foreman.png" 1764364968.83299 26755 f399e83f67628674d2f3d5d3760d5641 "" "images/3_limitations/foreman.png" 1764562988.4171 26755 f399e83f67628674d2f3d5d3760d5641 ""
"images/3_limitations/test.png" 1764446369.57847 41645 34977944089d9523fe5838109f6022d0 "" "images/3_limitations/test.png" 1764562988.4171 41645 34977944089d9523fe5838109f6022d0 ""
"images/3_limitations/worker.png" 1764364968.83413 27672 7065ad1534208191d96629b550f62ee6 "" "images/3_limitations/worker.png" 1764562988.4171 27672 7065ad1534208191d96629b550f62ee6 ""
"images/4_research_approach/procedure.png" 1764456080.21682 158772 222437d7a92958d3726adc307fb81a41 "" "images/4_research_approach/procedure.png" 1764562988.4171 158772 222437d7a92958d3726adc307fb81a41 ""
"images/5_metrics_of_success/controller.png" 1764524989.70379 16201 acc9519701bcfa19f86eca99d3384577 "" "images/5_metrics_of_success/controller.png" 1764562988.4171 16201 acc9519701bcfa19f86eca99d3384577 ""
"images/5_metrics_of_success/emerson_logo_only.png" 1763336452.14199 39830 5d65eddbc8dd9059f41efeb1cce2d010 "" "images/5_metrics_of_success/emerson_logo_only.png" 1764562988.41855 39830 5d65eddbc8dd9059f41efeb1cce2d010 ""
"images/5_metrics_of_success/puzzle.png" 1764524940.19403 34200 fdce865ec248104e6ec78e285f7424be "" "images/5_metrics_of_success/puzzle.png" 1764562988.41855 34200 fdce865ec248104e6ec78e285f7424be ""
"images/5_metrics_of_success/puzzle_complete.png" 1764524961.95624 15225 67fad16e593306dfeb6b5556393fe0c2 "" "images/5_metrics_of_success/puzzle_complete.png" 1764562988.41855 15225 67fad16e593306dfeb6b5556393fe0c2 ""
"images/back.jpg" 1763336452.15499 240691 0cb5c8c7430464955925d0babbadff74 "" "images/back.jpg" 1761320217.92102 240691 0cb5c8c7430464955925d0babbadff74 ""
"images/logo.png" 1763336452.15499 72759 d854b0b4145b18961bb2668be3694a61 "" "images/logo.png" 1761320217.92132 72759 d854b0b4145b18961bb2668be3694a61 ""
"images/money.png" 1764528073.18128 2809981 b860f10eb713a07689e4fdacf151aa3a "" "images/money.png" 1764562988.42576 2809981 b860f10eb713a07689e4fdacf151aa3a ""
"main.aux" 1764528717.79345 2391 6721552eb8de7e2c6faeaa8631bbbb10 "lualatex" "main.aux" 1764563114.58149 2391 6721552eb8de7e2c6faeaa8631bbbb10 "lualatex"
"main.nav" 1764528717.79445 1598 618c1f0e0c833a28bd61515fee3abbd6 "lualatex" "main.nav" 1764563114.58549 1598 618c1f0e0c833a28bd61515fee3abbd6 "lualatex"
"main.out" 1764528714.65643 0 d41d8cd98f00b204e9800998ecf8427e "lualatex" "main.out" 1764563087.3812 0 d41d8cd98f00b204e9800998ecf8427e "lualatex"
"main.tex" 1764472007.93178 1747 a0f09a38bfba635b118c46cdaf2edf1e "" "main.tex" 1764562988.44476 1747 a0f09a38bfba635b118c46cdaf2edf1e ""
"slides/1_Hook.tex" 1764365003.84351 2229 97b6feb9df84753abe53753986ce82f2 "" "slides/1_Hook.tex" 1764563076.90506 2229 e2a17857c26725b7887c3bb4e96f251a ""
"slides/2_State_of_the_Art.tex" 1764528587.81753 3175 f01c2424e116e785c132c1bd27008307 "" "slides/2_State_of_the_Art.tex" 1764562988.44476 3175 f01c2424e116e785c132c1bd27008307 ""
"slides/3_Limitations.tex" 1764448781.58692 1453 7f207d2afdea9d103a33718f4aa61f29 "" "slides/3_Limitations.tex" 1764562988.44476 1453 7f207d2afdea9d103a33718f4aa61f29 ""
"slides/4_Research_Approach.tex" 1764526335.09165 5144 862a985a17573a0f1c28226bcbc1acb6 "" "slides/4_Research_Approach.tex" 1764562988.44476 5144 862a985a17573a0f1c28226bcbc1acb6 ""
"slides/5_Metrics_of_Success.tex" 1764528517.83896 1789 65b1a4db3c5b190cddc3c715075bc024 "" "slides/5_Metrics_of_Success.tex" 1764562988.44476 1789 65b1a4db3c5b190cddc3c715075bc024 ""
"slides/6_Risks_and_Contingencies.tex" 1764528509.27265 399 387cde861931d5a6f8df4385a3b5edeb "" "slides/6_Risks_and_Contingencies.tex" 1764562988.44476 399 387cde861931d5a6f8df4385a3b5edeb ""
"slides/7_Broader_Impacts.tex" 1764528709.3864 1873 330e68ccc70b8191011c7f9d66ebf79b "" "slides/7_Broader_Impacts.tex" 1764562988.44476 1873 330e68ccc70b8191011c7f9d66ebf79b ""
"slides/8_Money_Slide.tex" 1764528646.84545 801 b3c68f4b7c746435d17d963b4e0cd476 "" "slides/8_Money_Slide.tex" 1764562988.44476 801 b3c68f4b7c746435d17d963b4e0cd476 ""
"theme/beamercolorthemedane_native.sty" 1764364326.03437 2320 f7b01a98de0d22c836b1a657249a51d2 "" "theme/beamercolorthemedane_native.sty" 1764562988.44576 2320 f7b01a98de0d22c836b1a657249a51d2 ""
"theme/beamerfontthemedane_native.sty" 1763336452.15682 1296 654c41f94efd9f9391ac224a886b5e98 "" "theme/beamerfontthemedane_native.sty" 1762977558.14195 1296 654c41f94efd9f9391ac224a886b5e98 ""
"theme/beamerinnerthemedane_native.sty" 1764528221.26407 2748 ae1cd84de5b3179f9cf8d6080e36cf1e "" "theme/beamerinnerthemedane_native.sty" 1764562988.44576 2748 ae1cd84de5b3179f9cf8d6080e36cf1e ""
"theme/beamerouterthemedane_native.sty" 1763336452.15682 2809 641a45b2e5f94647de8205e7bf8164c1 "" "theme/beamerouterthemedane_native.sty" 1762977557.81194 2809 641a45b2e5f94647de8205e7bf8164c1 ""
"theme/beamerthemedane_native.sty" 1763336452.15682 944 216604985b692d16917b9595dfc477ac "" "theme/beamerthemedane_native.sty" 1762977572.01625 944 216604985b692d16917b9595dfc477ac ""
(generated) (generated)
"main.aux" "main.aux"
"main.log" "main.log"

View File

@ -330,3 +330,583 @@ INPUT /usr/share/texmf/fonts/tfm/public/lm/ec-lmsso8.tfm
INPUT /usr/share/texmf/fonts/tfm/public/lm/ec-lmsso8.tfm INPUT /usr/share/texmf/fonts/tfm/public/lm/ec-lmsso8.tfm
INPUT ./images/logo.png INPUT ./images/logo.png
INPUT ./images/logo.png INPUT ./images/logo.png
INPUT ./images/logo.png
INPUT /usr/share/texmf/fonts/tfm/public/lm/ec-lmss17.tfm
INPUT /usr/share/texmf/fonts/tfm/public/lm/ec-lmssbx10.tfm
INPUT ./images/2_state_of_the_art/nuclear-plant.png
INPUT ./images/2_state_of_the_art/nuclear-plant.png
INPUT ./images/2_state_of_the_art/nuclear-plant.png
INPUT ./images/2_state_of_the_art/nuclear-plant.png
INPUT ./images/2_state_of_the_art/nuclear-plant.png
INPUT ./images/2_state_of_the_art/nuclear-plant.png
INPUT ./images/2_state_of_the_art/nuclear-plant.png
INPUT ./images/2_state_of_the_art/nuclear-plant.png
INPUT ./images/2_state_of_the_art/nuclear-plant.png
INPUT ./images/2_state_of_the_art/nuclear-plant.png
INPUT ./images/2_state_of_the_art/nuclear-plant.png
INPUT ./images/2_state_of_the_art/nuclear-plant.png
INPUT ./images/2_state_of_the_art/nuclear-plant.png
INPUT ./images/2_state_of_the_art/nuclear-plant.png
INPUT ./images/2_state_of_the_art/nuclear-plant.png
INPUT ./images/2_state_of_the_art/nuclear-plant.png
INPUT ./images/2_state_of_the_art/nuclear-plant.png
INPUT ./images/2_state_of_the_art/nuclear-plant.png
INPUT ./images/2_state_of_the_art/nuclear-plant.png
INPUT ./images/2_state_of_the_art/nuclear-plant.png
INPUT ./images/2_state_of_the_art/nuclear-plant.png
INPUT ./images/2_state_of_the_art/nuclear-plant.png
INPUT ./images/2_state_of_the_art/nuclear-plant.png
INPUT ./images/2_state_of_the_art/nuclear-plant.png
INPUT ./images/2_state_of_the_art/nuclear-plant.png
INPUT ./images/2_state_of_the_art/nuclear-plant.png
INPUT ./images/2_state_of_the_art/nuclear-plant.png
INPUT ./images/2_state_of_the_art/nuclear-plant.png
INPUT ./images/2_state_of_the_art/nuclear-plant.png
INPUT ./images/2_state_of_the_art/nuclear-plant.png
INPUT ./images/2_state_of_the_art/nuclear-plant.png
INPUT ./images/2_state_of_the_art/nuclear-plant.png
INPUT ./images/2_state_of_the_art/nuclear-plant.png
INPUT ./images/2_state_of_the_art/nuclear-plant.png
INPUT ./images/2_state_of_the_art/nuclear-plant.png
INPUT ./images/2_state_of_the_art/nuclear-plant.png
INPUT ./images/2_state_of_the_art/nuclear-plant.png
INPUT ./images/2_state_of_the_art/nuclear-plant.png
INPUT ./images/2_state_of_the_art/nuclear-plant.png
INPUT ./images/2_state_of_the_art/nuclear-plant.png
INPUT ./images/2_state_of_the_art/nuclear-plant.png
INPUT ./images/2_state_of_the_art/nuclear-plant.png
INPUT ./images/2_state_of_the_art/nuclear-plant.png
INPUT ./images/2_state_of_the_art/nuclear-plant.png
INPUT ./images/2_state_of_the_art/nuclear-plant.png
INPUT ./images/2_state_of_the_art/nuclear-plant.png
INPUT ./images/2_state_of_the_art/nuclear-plant.png
INPUT ./images/2_state_of_the_art/nuclear-plant.png
INPUT ./images/2_state_of_the_art/nuclear-plant.png
INPUT ./images/2_state_of_the_art/nuclear-plant.png
INPUT ./images/2_state_of_the_art/nuclear-plant.png
INPUT ./images/2_state_of_the_art/nuclear-plant.png
INPUT ./images/2_state_of_the_art/nuclear-plant.png
INPUT ./images/2_state_of_the_art/nuclear-plant.png
INPUT ./images/2_state_of_the_art/nuclear-plant.png
INPUT ./images/2_state_of_the_art/nuclear-plant.png
INPUT ./images/2_state_of_the_art/nuclear-plant.png
INPUT ./images/2_state_of_the_art/nuclear-plant.png
INPUT ./images/2_state_of_the_art/nuclear-plant.png
INPUT ./images/2_state_of_the_art/nuclear-plant.png
INPUT ./images/2_state_of_the_art/nuclear-plant.png
INPUT ./images/2_state_of_the_art/nuclear-plant.png
INPUT ./images/2_state_of_the_art/nuclear-plant.png
INPUT ./images/2_state_of_the_art/nuclear-plant.png
INPUT ./images/2_state_of_the_art/nuclear-plant.png
INPUT ./images/2_state_of_the_art/nuclear-plant.png
INPUT ./images/2_state_of_the_art/nuclear-plant.png
INPUT ./images/2_state_of_the_art/nuclear-plant.png
INPUT ./images/2_state_of_the_art/nuclear-plant.png
INPUT ./images/2_state_of_the_art/nuclear-plant.png
INPUT ./images/2_state_of_the_art/nuclear-plant.png
INPUT ./images/2_state_of_the_art/nuclear-plant.png
INPUT ./images/2_state_of_the_art/nuclear-plant.png
INPUT ./images/2_state_of_the_art/nuclear-plant.png
INPUT ./images/2_state_of_the_art/nuclear-plant.png
INPUT ./images/2_state_of_the_art/nuclear-plant.png
INPUT ./images/2_state_of_the_art/nuclear-plant.png
INPUT ./images/2_state_of_the_art/nuclear-plant.png
INPUT ./images/2_state_of_the_art/nuclear-plant.png
INPUT ./images/2_state_of_the_art/nuclear-plant.png
INPUT ./images/2_state_of_the_art/nuclear-plant.png
INPUT ./images/2_state_of_the_art/nuclear-plant.png
INPUT ./images/2_state_of_the_art/nuclear-plant.png
INPUT ./images/2_state_of_the_art/nuclear-plant.png
INPUT ./images/2_state_of_the_art/nuclear-plant.png
INPUT ./images/2_state_of_the_art/nuclear-plant.png
INPUT ./images/2_state_of_the_art/nuclear-plant.png
INPUT ./images/2_state_of_the_art/nuclear-plant.png
INPUT ./images/2_state_of_the_art/nuclear-plant.png
INPUT ./images/2_state_of_the_art/nuclear-plant.png
INPUT ./images/2_state_of_the_art/nuclear-plant.png
INPUT ./images/2_state_of_the_art/nuclear-plant.png
INPUT ./images/2_state_of_the_art/nuclear-plant.png
INPUT ./images/2_state_of_the_art/nuclear-plant.png
INPUT ./images/2_state_of_the_art/nuclear-plant.png
INPUT ./images/2_state_of_the_art/nuclear-plant.png
INPUT ./images/2_state_of_the_art/nuclear-plant.png
INPUT ./images/2_state_of_the_art/nuclear-plant.png
INPUT ./images/2_state_of_the_art/nuclear-plant.png
INPUT ./images/2_state_of_the_art/nuclear-plant.png
INPUT ./images/2_state_of_the_art/nuclear-plant.png
INPUT ./images/2_state_of_the_art/worker.png
INPUT ./images/2_state_of_the_art/worker.png
INPUT ./images/2_state_of_the_art/worker.png
INPUT ./images/2_state_of_the_art/worker.png
INPUT ./images/2_state_of_the_art/worker.png
INPUT ./images/2_state_of_the_art/worker.png
INPUT ./images/2_state_of_the_art/worker.png
INPUT ./images/2_state_of_the_art/worker.png
INPUT ./images/2_state_of_the_art/worker.png
INPUT ./images/2_state_of_the_art/worker.png
INPUT ./images/2_state_of_the_art/worker.png
INPUT ./images/2_state_of_the_art/worker.png
INPUT ./images/2_state_of_the_art/worker.png
INPUT ./images/2_state_of_the_art/worker.png
INPUT ./images/2_state_of_the_art/worker.png
INPUT ./images/2_state_of_the_art/worker.png
INPUT ./images/2_state_of_the_art/worker.png
INPUT ./images/2_state_of_the_art/worker.png
INPUT ./images/2_state_of_the_art/worker.png
INPUT ./images/2_state_of_the_art/worker.png
INPUT ./images/2_state_of_the_art/worker.png
INPUT /usr/share/texmf/fonts/tfm/public/lm/ec-lmssbx10.tfm
INPUT /usr/share/texmf/fonts/tfm/public/lm/ec-lmss12.tfm
INPUT /usr/share/texmf/fonts/tfm/public/lm/ec-lmssbx10.tfm
INPUT /usr/share/texlive/texmf-dist/fonts/tfm/public/cm/cmss12.tfm
INPUT /usr/share/texlive/texmf-dist/fonts/tfm/public/cm/cmss10.tfm
INPUT /usr/share/texlive/texmf-dist/fonts/tfm/public/cm/cmss8.tfm
INPUT /usr/share/texlive/texmf-dist/fonts/tfm/public/cm/cmmi12.tfm
INPUT /usr/share/texlive/texmf-dist/fonts/tfm/public/cm/cmmi10.tfm
INPUT /usr/share/texlive/texmf-dist/fonts/tfm/public/cm/cmmi7.tfm
INPUT /usr/share/texlive/texmf-dist/fonts/tfm/public/cm/cmsy10.tfm
INPUT /usr/share/texlive/texmf-dist/fonts/tfm/public/cm/cmsy10.tfm
INPUT /usr/share/texlive/texmf-dist/fonts/tfm/public/cm/cmsy7.tfm
INPUT /usr/share/texlive/texmf-dist/fonts/tfm/public/cm/cmex10.tfm
INPUT /usr/share/texlive/texmf-dist/fonts/tfm/public/cm/cmex10.tfm
INPUT /usr/share/texlive/texmf-dist/fonts/tfm/public/amsfonts/cmextra/cmex7.tfm
INPUT /usr/share/texlive/texmf-dist/tex/latex/amsfonts/umsa.fd
INPUT /usr/share/texlive/texmf-dist/fonts/tfm/public/amsfonts/symbols/msam10.tfm
INPUT /usr/share/texlive/texmf-dist/fonts/tfm/public/amsfonts/symbols/msam10.tfm
INPUT /usr/share/texlive/texmf-dist/fonts/tfm/public/amsfonts/symbols/msam7.tfm
INPUT /usr/share/texlive/texmf-dist/tex/latex/amsfonts/umsb.fd
INPUT /usr/share/texlive/texmf-dist/fonts/tfm/public/amsfonts/symbols/msbm10.tfm
INPUT /usr/share/texlive/texmf-dist/fonts/tfm/public/amsfonts/symbols/msbm10.tfm
INPUT /usr/share/texlive/texmf-dist/fonts/tfm/public/amsfonts/symbols/msbm7.tfm
INPUT /usr/share/texmf/fonts/tfm/public/lm/ec-lmss10.tfm
INPUT /usr/share/texmf/fonts/tfm/public/lm/ec-lmss8.tfm
INPUT /usr/share/texmf/fonts/tfm/public/lm/ec-lmsso12.tfm
INPUT /usr/share/texmf/fonts/tfm/public/lm/ec-lmsso12.tfm
INPUT /usr/share/texmf/fonts/tfm/public/lm/ec-lmsso10.tfm
INPUT /usr/share/texmf/fonts/tfm/public/lm/ec-lmsso10.tfm
INPUT /usr/share/texmf/fonts/tfm/public/lm/ec-lmsso8.tfm
INPUT /usr/share/texmf/fonts/tfm/public/lm/ec-lmsso8.tfm
INPUT ./images/logo.png
INPUT ./images/back.jpg
INPUT ./images/back.jpg
INPUT /usr/share/texmf/fonts/tfm/public/lm/ec-lmss8.tfm
INPUT ./images/logo.png
INPUT /var/lib/texmf/fonts/map/pdftex/updmap/pdftex.map
INPUT ./slides/1_Hook.tex
INPUT ./images/logo.png
INPUT ./images/1_hook/energy-demand-graph-small.png
INPUT ./images/1_hook/energy-demand-graph-small.png
INPUT /usr/share/texmf/fonts/tfm/public/lm/ec-lmss8.tfm
INPUT /usr/share/texmf/fonts/tfm/public/lm/ec-lmss17.tfm
INPUT /usr/share/texmf/fonts/tfm/public/lm/ec-lmssbx10.tfm
INPUT /usr/share/texlive/texmf-dist/fonts/tfm/public/cm/cmss17.tfm
INPUT /usr/share/texlive/texmf-dist/fonts/tfm/public/cm/cmss12.tfm
INPUT /usr/share/texlive/texmf-dist/fonts/tfm/public/cm/cmmi12.tfm
INPUT /usr/share/texlive/texmf-dist/fonts/tfm/public/cm/cmmi12.tfm
INPUT /usr/share/texlive/texmf-dist/fonts/tfm/public/cm/cmsy10.tfm
INPUT /usr/share/texlive/texmf-dist/fonts/tfm/public/cm/cmsy10.tfm
INPUT /usr/share/texlive/texmf-dist/fonts/tfm/public/cm/cmex10.tfm
INPUT /usr/share/texlive/texmf-dist/fonts/tfm/public/cm/cmex10.tfm
INPUT /usr/share/texlive/texmf-dist/fonts/tfm/public/amsfonts/symbols/msam10.tfm
INPUT /usr/share/texlive/texmf-dist/fonts/tfm/public/amsfonts/symbols/msam10.tfm
INPUT /usr/share/texlive/texmf-dist/fonts/tfm/public/amsfonts/symbols/msbm10.tfm
INPUT /usr/share/texlive/texmf-dist/fonts/tfm/public/amsfonts/symbols/msbm10.tfm
INPUT /usr/share/texmf/fonts/tfm/public/lm/ec-lmsso17.tfm
INPUT /usr/share/texmf/fonts/tfm/public/lm/ec-lmsso17.tfm
INPUT /usr/share/texmf/fonts/tfm/public/lm/ec-lmsso12.tfm
INPUT /usr/share/texmf/fonts/tfm/public/lm/ec-lmsso12.tfm
INPUT ./images/back.jpg
INPUT ./images/logo.png
INPUT ./images/1_hook/energy-demand-graph-small.png
INPUT ./images/1_hook/nuclear-plant.png
INPUT ./images/1_hook/nuclear-plant.png
INPUT ./images/1_hook/nuclear-plant.png
INPUT ./images/1_hook/nuclear-plant.png
INPUT ./images/1_hook/nuclear-plant.png
INPUT ./images/1_hook/nuclear-plant.png
INPUT ./images/1_hook/nuclear-plant.png
INPUT ./images/1_hook/nuclear-plant.png
INPUT ./images/1_hook/nuclear-plant.png
INPUT ./images/1_hook/nuclear-plant.png
INPUT ./images/1_hook/nuclear-plant.png
INPUT ./images/1_hook/nuclear-plant.png
INPUT ./images/1_hook/nuclear-plant.png
INPUT ./images/1_hook/nuclear-plant.png
INPUT ./images/1_hook/nuclear-plant.png
INPUT ./images/1_hook/nuclear-plant.png
INPUT ./images/1_hook/nuclear-plant.png
INPUT ./images/1_hook/nuclear-plant.png
INPUT ./images/1_hook/nuclear-plant.png
INPUT ./images/1_hook/nuclear-plant.png
INPUT ./images/1_hook/nuclear-plant.png
INPUT ./images/1_hook/nuclear-plant.png
INPUT ./images/1_hook/nuclear-plant.png
INPUT ./images/1_hook/nuclear-plant.png
INPUT ./images/1_hook/nuclear-plant.png
INPUT ./images/1_hook/nuclear-plant.png
INPUT ./images/1_hook/nuclear-plant.png
INPUT ./images/1_hook/nuclear-plant.png
INPUT ./images/1_hook/nuclear-plant.png
INPUT ./images/1_hook/nuclear-plant.png
INPUT ./images/1_hook/nuclear-plant.png
INPUT ./images/back.jpg
INPUT ./images/logo.png
INPUT ./images/1_hook/energy-demand-graph-small.png
INPUT ./images/1_hook/nuclear-plant.png
INPUT ./images/1_hook/nuclear-plant.png
INPUT ./images/1_hook/nuclear-plant.png
INPUT ./images/1_hook/nuclear-plant.png
INPUT ./images/1_hook/nuclear-plant.png
INPUT ./images/1_hook/nuclear-plant.png
INPUT ./images/1_hook/nuclear-plant.png
INPUT ./images/1_hook/nuclear-plant.png
INPUT ./images/1_hook/nuclear-plant.png
INPUT ./images/1_hook/nuclear-plant.png
INPUT ./images/1_hook/nuclear-plant.png
INPUT ./images/1_hook/nuclear-plant.png
INPUT ./images/1_hook/nuclear-plant.png
INPUT ./images/1_hook/nuclear-plant.png
INPUT ./images/1_hook/nuclear-plant.png
INPUT ./images/1_hook/nuclear-plant.png
INPUT ./images/1_hook/nuclear-plant.png
INPUT ./images/1_hook/nuclear-plant.png
INPUT ./images/1_hook/nuclear-plant.png
INPUT ./images/1_hook/nuclear-plant.png
INPUT ./images/1_hook/nuclear-plant.png
INPUT ./images/1_hook/nuclear-plant.png
INPUT ./images/1_hook/nuclear-plant.png
INPUT ./images/1_hook/nuclear-plant.png
INPUT ./images/1_hook/nuclear-plant.png
INPUT ./images/1_hook/nuclear-plant.png
INPUT ./images/1_hook/nuclear-plant.png
INPUT ./images/1_hook/nuclear-plant.png
INPUT ./images/1_hook/nuclear-plant.png
INPUT ./images/1_hook/nuclear-plant.png
INPUT ./images/1_hook/nuclear-plant.png
INPUT ./images/1_hook/nuclear-plant.png
INPUT ./images/1_hook/nuclear-plant.png
INPUT ./images/1_hook/nuclear-plant.png
INPUT ./images/1_hook/nuclear-plant.png
INPUT ./images/1_hook/nuclear-plant.png
INPUT ./images/1_hook/nuclear-plant.png
INPUT ./images/1_hook/nuclear-plant.png
INPUT ./images/1_hook/nuclear-plant.png
INPUT ./images/1_hook/nuclear-plant.png
INPUT ./images/1_hook/nuclear-plant.png
INPUT ./images/1_hook/nuclear-plant.png
INPUT ./images/1_hook/nuclear-plant.png
INPUT ./images/1_hook/nuclear-plant.png
INPUT ./images/1_hook/nuclear-plant.png
INPUT ./images/1_hook/nuclear-plant.png
INPUT ./images/1_hook/nuclear-plant.png
INPUT ./images/1_hook/nuclear-plant.png
INPUT ./images/1_hook/nuclear-plant.png
INPUT ./images/1_hook/nuclear-plant.png
INPUT ./images/1_hook/nuclear-plant.png
INPUT ./images/1_hook/nuclear-plant.png
INPUT ./images/1_hook/nuclear-plant.png
INPUT ./images/1_hook/nuclear-plant.png
INPUT ./images/1_hook/nuclear-plant.png
INPUT ./images/1_hook/nuclear-plant.png
INPUT ./images/1_hook/nuclear-plant.png
INPUT ./images/1_hook/nuclear-plant.png
INPUT ./images/1_hook/nuclear-plant.png
INPUT ./images/1_hook/nuclear-plant.png
INPUT ./images/1_hook/nuclear-plant.png
INPUT ./images/1_hook/nuclear-plant.png
INPUT ./images/1_hook/nuclear-plant.png
INPUT ./images/1_hook/nuclear-plant.png
INPUT ./images/1_hook/nuclear-plant.png
INPUT ./images/1_hook/nuclear-plant.png
INPUT ./images/1_hook/nuclear-plant.png
INPUT ./images/1_hook/nuclear-plant.png
INPUT ./images/1_hook/nuclear-plant.png
INPUT ./images/1_hook/nuclear-plant.png
INPUT ./images/1_hook/nuclear-plant.png
INPUT ./images/1_hook/nuclear-plant.png
INPUT ./images/1_hook/nuclear-plant.png
INPUT ./images/1_hook/nuclear-plant.png
INPUT ./images/1_hook/nuclear-plant.png
INPUT ./images/1_hook/nuclear-plant.png
INPUT ./images/1_hook/nuclear-plant.png
INPUT ./images/1_hook/nuclear-plant.png
INPUT ./images/1_hook/nuclear-plant.png
INPUT ./images/1_hook/nuclear-plant.png
INPUT ./images/1_hook/nuclear-plant.png
INPUT ./images/1_hook/nuclear-plant.png
INPUT ./images/1_hook/nuclear-plant.png
INPUT ./images/1_hook/nuclear-plant.png
INPUT ./images/1_hook/nuclear-plant.png
INPUT ./images/1_hook/nuclear-plant.png
INPUT ./images/1_hook/nuclear-plant.png
INPUT ./images/1_hook/nuclear-plant.png
INPUT ./images/1_hook/nuclear-plant.png
INPUT ./images/1_hook/nuclear-plant.png
INPUT ./images/1_hook/nuclear-plant.png
INPUT ./images/1_hook/nuclear-plant.png
INPUT ./images/1_hook/nuclear-plant.png
INPUT ./images/1_hook/nuclear-plant.png
INPUT ./images/1_hook/nuclear-plant.png
INPUT ./images/1_hook/nuclear-plant.png
INPUT ./images/1_hook/nuclear-plant.png
INPUT ./images/1_hook/nuclear-plant.png
INPUT ./images/1_hook/nuclear-plant.png
INPUT ./images/1_hook/nuclear-plant.png
INPUT ./images/back.jpg
INPUT ./images/logo.png
INPUT ./slides/2_State_of_the_Art.tex
INPUT ./images/logo.png
INPUT ./images/2_state_of_the_art/nuclear-plant.png
INPUT ./images/back.jpg
INPUT ./images/logo.png
INPUT ./images/2_state_of_the_art/nuclear-plant.png
INPUT ./images/2_state_of_the_art/foreman.png
INPUT ./images/2_state_of_the_art/foreman.png
INPUT ./images/2_state_of_the_art/foreman.png
INPUT ./images/2_state_of_the_art/worker.png
INPUT ./images/2_state_of_the_art/worker.png
INPUT ./images/back.jpg
INPUT ./images/logo.png
INPUT ./images/2_state_of_the_art/nuclear-plant.png
INPUT ./images/2_state_of_the_art/foreman.png
INPUT ./images/2_state_of_the_art/foreman.png
INPUT ./images/2_state_of_the_art/foreman.png
INPUT ./images/2_state_of_the_art/foreman.png
INPUT ./images/2_state_of_the_art/foreman.png
INPUT ./images/2_state_of_the_art/foreman.png
INPUT ./images/2_state_of_the_art/foreman.png
INPUT ./images/2_state_of_the_art/foreman.png
INPUT ./images/2_state_of_the_art/foreman.png
INPUT ./images/2_state_of_the_art/foreman.png
INPUT ./images/2_state_of_the_art/foreman.png
INPUT ./images/2_state_of_the_art/foreman.png
INPUT ./images/2_state_of_the_art/worker.png
INPUT ./images/2_state_of_the_art/worker.png
INPUT ./images/2_state_of_the_art/worker.png
INPUT ./images/2_state_of_the_art/worker.png
INPUT ./images/2_state_of_the_art/worker.png
INPUT ./images/2_state_of_the_art/worker.png
INPUT ./images/2_state_of_the_art/worker.png
INPUT ./images/2_state_of_the_art/worker.png
INPUT ./images/2_state_of_the_art/worker.png
INPUT ./images/2_state_of_the_art/worker.png
INPUT ./images/2_state_of_the_art/worker.png
INPUT ./images/2_state_of_the_art/worker.png
INPUT ./images/back.jpg
INPUT ./images/logo.png
INPUT ./images/2_state_of_the_art/nuclear-plant.png
INPUT ./images/2_state_of_the_art/foreman.png
INPUT ./images/2_state_of_the_art/foreman.png
INPUT ./images/2_state_of_the_art/foreman.png
INPUT ./images/2_state_of_the_art/foreman.png
INPUT ./images/2_state_of_the_art/foreman.png
INPUT ./images/2_state_of_the_art/foreman.png
INPUT ./images/2_state_of_the_art/foreman.png
INPUT ./images/2_state_of_the_art/foreman.png
INPUT ./images/2_state_of_the_art/foreman.png
INPUT ./images/2_state_of_the_art/foreman.png
INPUT ./images/2_state_of_the_art/foreman.png
INPUT ./images/2_state_of_the_art/foreman.png
INPUT ./images/2_state_of_the_art/worker.png
INPUT ./images/2_state_of_the_art/worker.png
INPUT ./images/2_state_of_the_art/worker.png
INPUT ./images/2_state_of_the_art/worker.png
INPUT ./images/2_state_of_the_art/worker.png
INPUT ./images/2_state_of_the_art/worker.png
INPUT ./images/2_state_of_the_art/worker.png
INPUT ./images/2_state_of_the_art/worker.png
INPUT ./images/2_state_of_the_art/worker.png
INPUT ./images/2_state_of_the_art/worker.png
INPUT ./images/2_state_of_the_art/worker.png
INPUT ./images/2_state_of_the_art/worker.png
INPUT ./images/back.jpg
INPUT ./images/logo.png
INPUT ./images/2_state_of_the_art/nuclear-plant.png
INPUT ./images/2_state_of_the_art/foreman.png
INPUT ./images/2_state_of_the_art/foreman.png
INPUT ./images/2_state_of_the_art/foreman.png
INPUT ./images/2_state_of_the_art/foreman.png
INPUT ./images/2_state_of_the_art/foreman.png
INPUT ./images/2_state_of_the_art/foreman.png
INPUT ./images/2_state_of_the_art/foreman.png
INPUT ./images/2_state_of_the_art/foreman.png
INPUT ./images/2_state_of_the_art/foreman.png
INPUT ./images/2_state_of_the_art/foreman.png
INPUT ./images/2_state_of_the_art/foreman.png
INPUT ./images/2_state_of_the_art/foreman.png
INPUT ./images/2_state_of_the_art/worker.png
INPUT ./images/2_state_of_the_art/worker.png
INPUT ./images/2_state_of_the_art/worker.png
INPUT ./images/2_state_of_the_art/worker.png
INPUT ./images/2_state_of_the_art/worker.png
INPUT ./images/2_state_of_the_art/worker.png
INPUT ./images/2_state_of_the_art/worker.png
INPUT ./images/2_state_of_the_art/worker.png
INPUT ./images/2_state_of_the_art/worker.png
INPUT ./images/2_state_of_the_art/worker.png
INPUT ./images/2_state_of_the_art/worker.png
INPUT ./images/2_state_of_the_art/worker.png
INPUT ./images/back.jpg
INPUT ./images/logo.png
INPUT ./images/logo.png
INPUT ./images/2_state_of_the_art/control_room.jpg
INPUT ./images/2_state_of_the_art/control_room.jpg
INPUT ./images/back.jpg
INPUT ./images/logo.png
INPUT ./slides/3_Limitations.tex
INPUT ./images/logo.png
INPUT ./images/3_limitations/foreman.png
INPUT ./images/3_limitations/foreman.png
INPUT ./images/3_limitations/worker.png
INPUT ./images/3_limitations/worker.png
INPUT ./images/back.jpg
INPUT ./images/logo.png
INPUT ./images/3_limitations/foreman.png
INPUT ./images/3_limitations/worker.png
INPUT ./images/3_limitations/computer.png
INPUT ./images/3_limitations/computer.png
INPUT ./images/back.jpg
INPUT ./images/logo.png
INPUT ./images/3_limitations/foreman.png
INPUT ./images/3_limitations/worker.png
INPUT ./images/3_limitations/computer.png
INPUT ./images/3_limitations/test.png
INPUT ./images/3_limitations/test.png
INPUT ./images/back.jpg
INPUT ./images/logo.png
INPUT ./slides/4_Research_Approach.tex
INPUT ./images/logo.png
INPUT ./images/back.jpg
INPUT ./images/logo.png
INPUT ./images/back.jpg
INPUT ./images/logo.png
INPUT ./images/back.jpg
INPUT ./images/logo.png
INPUT ./images/back.jpg
INPUT ./images/logo.png
INPUT ./images/logo.png
INPUT ./images/4_research_approach/procedure.png
INPUT ./images/4_research_approach/procedure.png
INPUT ./images/back.jpg
INPUT ./images/logo.png
INPUT ./images/4_research_approach/procedure.png
INPUT /usr/share/texmf/tex/latex/lm/t1lmtt.fd
INPUT /usr/share/texmf/fonts/tfm/public/lm/ec-lmtt8.tfm
INPUT ./images/back.jpg
INPUT ./images/logo.png
INPUT ./images/4_research_approach/procedure.png
INPUT /usr/share/texlive/texmf-dist/fonts/tfm/public/cm/cmss8.tfm
INPUT /usr/share/texlive/texmf-dist/fonts/tfm/public/cm/cmss8.tfm
INPUT /usr/share/texlive/texmf-dist/fonts/tfm/public/cm/cmss8.tfm
INPUT /usr/share/texlive/texmf-dist/fonts/tfm/public/cm/cmmi8.tfm
INPUT /usr/share/texlive/texmf-dist/fonts/tfm/public/cm/cmmi6.tfm
INPUT /usr/share/texlive/texmf-dist/fonts/tfm/public/cm/cmmi5.tfm
INPUT /usr/share/texlive/texmf-dist/fonts/tfm/public/cm/cmsy8.tfm
INPUT /usr/share/texlive/texmf-dist/fonts/tfm/public/cm/cmsy6.tfm
INPUT /usr/share/texlive/texmf-dist/fonts/tfm/public/cm/cmsy5.tfm
INPUT /usr/share/texlive/texmf-dist/fonts/tfm/public/amsfonts/cmextra/cmex8.tfm
INPUT /usr/share/texlive/texmf-dist/fonts/tfm/public/amsfonts/cmextra/cmex7.tfm
INPUT /usr/share/texlive/texmf-dist/fonts/tfm/public/amsfonts/cmextra/cmex7.tfm
INPUT /usr/share/texlive/texmf-dist/fonts/tfm/public/amsfonts/symbols/msam10.tfm
INPUT /usr/share/texlive/texmf-dist/fonts/tfm/public/amsfonts/symbols/msam7.tfm
INPUT /usr/share/texlive/texmf-dist/fonts/tfm/public/amsfonts/symbols/msam5.tfm
INPUT /usr/share/texlive/texmf-dist/fonts/tfm/public/amsfonts/symbols/msbm10.tfm
INPUT /usr/share/texlive/texmf-dist/fonts/tfm/public/amsfonts/symbols/msbm7.tfm
INPUT /usr/share/texlive/texmf-dist/fonts/tfm/public/amsfonts/symbols/msbm5.tfm
INPUT /usr/share/texmf/fonts/tfm/public/lm/ec-lmss8.tfm
INPUT /usr/share/texmf/fonts/tfm/public/lm/ec-lmsso8.tfm
INPUT /usr/share/texmf/fonts/tfm/public/lm/ec-lmsso8.tfm
INPUT /usr/share/texmf/fonts/tfm/public/lm/ec-lmsso8.tfm
INPUT /usr/share/texmf/fonts/tfm/public/lm/ec-lmsso8.tfm
INPUT ./images/back.jpg
INPUT ./images/logo.png
INPUT ./images/logo.png
INPUT ./images/back.jpg
INPUT ./images/logo.png
INPUT ./images/logo.png
INPUT ./bouncing_ball_hybrid.png
INPUT ./bouncing_ball_hybrid.png
INPUT ./images/back.jpg
INPUT ./images/logo.png
INPUT ./bouncing_ball_hybrid.png
INPUT ./images/back.jpg
INPUT ./images/logo.png
INPUT ./bouncing_ball_hybrid.png
INPUT ./images/back.jpg
INPUT ./images/logo.png
INPUT ./bouncing_ball_hybrid.png
INPUT ./images/back.jpg
INPUT ./images/logo.png
INPUT ./images/logo.png
INPUT ./images/back.jpg
INPUT ./images/logo.png
INPUT ./images/back.jpg
INPUT ./images/logo.png
INPUT ./images/back.jpg
INPUT ./images/logo.png
INPUT ./images/back.jpg
INPUT ./images/logo.png
INPUT ./slides/5_Metrics_of_Success.tex
INPUT ./images/logo.png
INPUT ./images/5_metrics_of_success/puzzle.png
INPUT ./images/5_metrics_of_success/puzzle.png
INPUT ./images/back.jpg
INPUT ./images/logo.png
INPUT ./images/5_metrics_of_success/puzzle.png
INPUT ./images/5_metrics_of_success/puzzle_complete.png
INPUT ./images/5_metrics_of_success/puzzle_complete.png
INPUT ./images/back.jpg
INPUT ./images/logo.png
INPUT ./images/5_metrics_of_success/puzzle.png
INPUT ./images/5_metrics_of_success/puzzle_complete.png
INPUT ./images/5_metrics_of_success/controller.png
INPUT ./images/5_metrics_of_success/controller.png
INPUT ./images/5_metrics_of_success/emerson_logo_only.png
INPUT ./images/5_metrics_of_success/emerson_logo_only.png
INPUT ./images/back.jpg
INPUT ./images/logo.png
INPUT ./slides/6_Risks_and_Contingencies.tex
INPUT ./images/logo.png
INPUT ./images/back.jpg
INPUT ./images/logo.png
INPUT ./images/back.jpg
INPUT ./images/logo.png
INPUT ./images/back.jpg
INPUT ./images/logo.png
INPUT ./images/back.jpg
INPUT ./images/logo.png
INPUT ./slides/7_Broader_Impacts.tex
INPUT ./images/logo.png
INPUT /usr/share/texmf/fonts/tfm/public/lm/ec-lmssbx10.tfm
INPUT /usr/share/texmf/fonts/tfm/public/lm/ec-lmssbx10.tfm
INPUT ./images/back.jpg
INPUT ./images/logo.png
INPUT ./images/back.jpg
INPUT ./images/logo.png
INPUT ./images/back.jpg
INPUT ./images/logo.png
INPUT ./images/logo.png
INPUT ./images/back.jpg
INPUT ./images/logo.png
INPUT ./slides/8_Money_Slide.tex
INPUT ./images/logo.png
INPUT ./images/money.png
INPUT ./images/money.png
INPUT ./images/back.jpg
OUTPUT main.nav
OUTPUT main.toc
OUTPUT main.snm
INPUT ./main.aux
INPUT ./main.out
INPUT /usr/share/texlive/texmf-dist/fonts/type1/public/amsfonts/cm/cmmi12.pfb
INPUT /usr/share/texlive/texmf-dist/fonts/type1/public/amsfonts/cm/cmss12.pfb
INPUT /usr/share/texlive/texmf-dist/fonts/type1/public/amsfonts/cm/cmsy10.pfb
INPUT /usr/share/texlive/texmf-dist/fonts/type1/public/amsfonts/cm/cmsy8.pfb
INPUT /usr/share/texmf/fonts/type1/public/lm/lmss12.pfb
INPUT /usr/share/texmf/fonts/type1/public/lm/lmss8.pfb
INPUT /usr/share/texmf/fonts/type1/public/lm/lmssbx10.pfb
INPUT /usr/share/texmf/fonts/type1/public/lm/lmsso12.pfb
INPUT /usr/share/texmf/fonts/type1/public/lm/lmsso17.pfb
INPUT /usr/share/texmf/fonts/type1/public/lm/lmsso8.pfb
INPUT /usr/share/texmf/fonts/type1/public/lm/lmtt8.pfb
INPUT /usr/share/texlive/texmf-dist/fonts/type1/public/amsfonts/symbols/msam10.pfb

File diff suppressed because it is too large Load Diff

Binary file not shown.

Binary file not shown.

View File

@ -0,0 +1,11 @@
# CISA ICS Training Notes
## Russ' Quiz
% data breaches involving phishing --- 15%
% of all breaches involving human error --- 68%
% financially motivated incidents that involve ransomware or
extrotion --- 92%
Year the PLC was invented? --- 1968